Laserfiche WebLink
Thursaber 155th_ -19 17 cant i <br />3Uad <br />MAIN STREET <br />Excavation <br />2138 cu. yds. at .75 per cu. yd. <br />19603.50 <br />;1 <br />Pavement <br />1741 sib. yde at 2.50 per sq. yd. <br />'49352 50 <br />Curb and gutter" °` <br />i060 lin. ft, at .60 per lin ft. <br />636.00 <br />Cement walk' ° <br />` <br />,11046 sq. ft. at .15 per sq. ft. <br />1,656.90 <br />S'giare ineta : > ° <br />6 at MOO each. <br />90.00 <br />8 inch pipe ,sewer <br />200 lin. ft. at .80 per lin ft. <br />160.00 <br />Inlets <br />2 at 10.00 each. <br />20.00 <br />Yadh*leareset <br />2 at 10.00 each <br />20.00 <br />Lowering water mains and serviced <br />° <br />407.00 <br />8,945.90 <br />Engineering and c oat ingenc ies 10% <br />8 p <br />LAFAYETTE STREET. <br />Excavation <br />1683 cu. yds. at .75 per cu. yd. <br />1, 262.25 <br />Pavement <br />1670 sq. yds. at 2.50 per sq. yd. <br />40175,. 00 <br />Curb and gutter <br />936 lin. ft. at .60 per lin. ft. <br />561.60 <br />Cement walk, ° <br />9922.• sq. ft. at .15 per sq. ft. <br />19488.30 <br />8 inch sewer pipe <br />128 .lin. ft. at .80 per lin ft. <br />102.40 <br />-Square ix is <br />6 ,at 15.00 eaeh <br />90.00 <br />nii� s " <br />-at 10.00 each <br />20.00 <br />Manhole reset ° <br />1 at 10.00 <br />10.00 <br />..Lowering water mains and service& <br />Engineering and c ont ingenc ies 10% <br />1,209.55 <br />82A. 45 <br />9*030.00 <br />4 <br />TAYLOR STREET AND PRAIRIE AVENUE. <br />Excavat ion a <br />Curb .and gutter , <br />Cement walk <br />Pavement <br />Square inlets <br />Inlets <br />8 _ inch pipe sewer . <br />vanheles reset <br />Inlets - reset <br />Lowering water mains and services <br />Engineering and cent ingenc ies 10% <br />SOUTH°STREET AND TAYLOR STREET. <br />-,Excavation <br />Curb and gutter ° <br />Cement walk <br />Pavement <br />Square inlets <br />8 inch pipe sewer <br />Engineering and cent ingenc ies 10% <br />SOUTH'STREET AND TAYLOR STREET EAST. <br />P�xeavet ion <br />Cement walk <br />Curb and gutter <br />Pavement <br />Square inlets ° <br />8 inch pipe sewer <br />Loweringwater mains and services <br />Engineering: and a ent ingenc ies le% <br />5580 <br />cu. <br />yda. <br />at .75 <br />per cu. <br />yd. <br />$ 40185.00 <br />1108 <br />lin. <br />ft. <br />at .60 <br />per lin <br />ft. <br />664.80 <br />9462. <br />sq. <br />ft. <br />at .15 <br />pr sq. ft. <br />1,419.30 <br />2100 <br />sq. <br />yds: <br />at 2.50 per sq. <br />yd. <br />5,250.00 <br />5 <br />at. <br />15.00 <br />each. <br />75.00 <br />• 3 <br />at 10.00 <br />each <br />30.00 <br />180 <br />lin <br />ft. <br />at .80 <br />per lin. <br />ft. <br />144.00 <br />4 <br />at <br />10.00 <br />each <br />40.00 <br />2 <br />at 2.00 each <br />4.0p <br />,1._ <br />12. 37#45� <br />° 1 282 ,55 <br />149120.00. <br />120 eu.. yda. at .75 per cu. yd. $ 90.00 <br />150 <br />lin. <br />ft. <br />at .60 per lin ft. <br />90.00 <br />375 <br />sq. <br />ft. <br />at .15 per sq. ft. <br />56 .25 <br />100 <br />sq. <br />yda._at.2.50 <br />paver sq. yd. <br />250.00 <br />2 <br />s4t <br />MOS <br />bae- ,t <br />30.00 <br />20 <br />lin. <br />ft. <br />at .80 per lin ft. <br />_-16, oo <br />532.25 <br />5 <br />590.00 - <br />220* cu* yds. at .75 per cu. yd. $ '165.00 <br />600 sq. ft. at .15 per sq. ft. 90.00 <br />100 lin. ft. at .60 per tin ft. 60.00 <br />260. Sq. yds. at 2.50 per sq. yd.' 650.00 <br />2 at 15.00 each 30.QO <br />30. at .60 per lin ft. 24.00 <br />4 1, 366. OD <br />334. oe <br />$ 1,500.00 <br />