Laserfiche WebLink
218 <br />STREET. <br />Beard met In.regular session at 10:00 A.M. Mr. A. H. Rice absent. <br />Bids were received, opened and read t`£or the following improvements. <br />PIPE SEWER ON PORTAGE AVENUE'FROM PORTAGE AVENUE TO ALLEY NORTH OF KINYON <br />o <br />Bid of The National Co. by Geo. A. Ha,rrop. <br />12 inch pi;�e sewer, per lin ft.................................02.40 <br />8 inch pipe sewer, per lin ft. ......................... o50 <br />6 inch pipe sewer, per lin ft............... a............... 0 <br />Manholes, curbs and covers, each...............................10.00 <br />B id of Stanl es & Ackerman, <br />12 inch pipe sever, per lin ft................................$ 2.25 <br />8 inch pipe sewer, per lin ft... ............................ ,75 <br />6 inch -pipe sewer, per lin ft................... .85 <br />Storm water inlets, each .................. 0.0................. 8.00 <br />Flush tank 8 X 12 TtS, each...., 6.00 <br />-Bid of .,Hoban & Roach.... . <br />12 inch pipe sewer, per lin ft .............................. $2.30 <br />8 inch pipe sewer per lin ft ............................... .75 <br />6 inch pipe sewer, per linft. ............................. .90 <br />Manholes, per ft. in depth ................................ 6.00 <br />Manholes, curbs and covers, each ........... 0................. 15,00 <br />Storm water inlets, each.... 000.0.0 ....... 8.00 <br />PIPE SERER ON PLEASANT STREET FROM NINTH STREET TO EIGTHTH STREET. <br />Bid of Staples & Ackerman. <br />12 inch pipe sewer, per linft .............................$$ 2.05 <br />6 inch pipe sewer, per lin ft............................. .85 <br />Manholes, per ft. in depth...... ........................`., 6.00 <br />Manholes, curbs and covers, each 15.00- <br />. B id. of Bruno De Peape, <br />12 inoh pipe sewer, per lin ft............................$ 2.01 <br />6 inch pipe sewer, per lin ft............................ .85 <br />UanhUfles, per ft. in depth ................................ 6.00 <br />Uanholes, curbs and covers, each .......................... 15.00 <br />All of the above bids were referred to the City Civil Engineer for tabu- <br />lation to be reported on at 7:45 P.M. this 13th. day of November 1917. <br />Attorney Wm. A. McInerny representing the White Construction Company <br />appeared before the Board in regard to decision on mortar cushion under street <br />car tacks on Eddy Street and Mishawaka Avenue from Jefferson Blvd. to Nineteenth <br />Street . The Board decided to defer decision on said matter until Wednesday <br />November 14th.,1917 at 5:00 P.U. Said decision held UD until this date to give <br />Attorney H. A. Wair, Counsel for the Chicago, South Bend & Northern Indiana ,ty. <br />Company , a chance to give this matter consideration. <br />Mr. Joseph Grunwald met with the Board and discussed the matter of <br />assessment for •wa.ter taps •on ,Dubail °Avenue. The Board inform him that this matter <br />would be taken up at Water Works session to be held Wednesday November 14th.,1917 <br />at 10: 00 A.M. <br />Partial.estimate allowed Staples & Ackerman or. pipe sewer improvement on <br />✓ Niles Avenue at..........................................................$740.51 <br />Petition received for a pipe sewer on Irvington. Avenue in Irvington <br />./ Addition. Same read and referred to the City Engineer for investigation. <br />r/ Partial estimate allowed Staples & Ackerman on pipe sewer on Dunna, <br />„/ Street from C-& Street to Scott Street, a.t............................ 692.57 <br />