My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - INDOT School Zone Flashing Beacon Assemblies Project No 117-075R - A&F Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Proposals - INDOT School Zone Flashing Beacon Assemblies Project No 117-075R - A&F Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 12:56:14 PM
Creation date
1/24/2019 8:44:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A&F ENGINEERING I CITY OF SOUTHBEND I SCHOOL ZONE FLASHING BEACONS I DES# 1801240 <br />Project: Central Business District Countdown Pedestrian Indication Replacement (HSIP <br />Funding) <br />Client: City of Indianapolis <br />® Design services to upgrade multiple signals in <br />Downtown Indianapolis <br />• Project was expedited for Super Bowl <br />® A&F also coordinated environmental documentation, <br />right-of-way certification, and amendment of TIP/STIP <br />The City of Indianapolis currently has over 1,400 pedestrian <br />indications within its Central Business District. Prior to 2011, fewer <br />than 500 of these indications were countdown -style. With the <br />already high levels of pedestrian traffic in the area expected to <br />grow with completion of the Cultural Trail, the City applied for and <br />received HSIP funding to upgrade many of these signals and <br />improve pedestrian safety. <br />Adding to the project's urgency, the City wished to have all of the <br />upgrades complete in time to welcome guests for the 2012 Super <br />Bowl. To expedite the installation, A&F performed all of the design <br />services, including coordination of the approval of the <br />environmental documentation, coordination of the right-of-way <br />certification, and amendment of the TIP/STIP. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.