Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Lib.! t Tower Exterior Renovations <br />Project No. 118-086R <br />For Bids Due: January 22, 2019 <br />Contractor Name: THE ROBERT HENRY CORPORATION <br />BASE BID: DIVISION D: SIDEWALK AND CURB REPLACEMENT <br />WORK <br />ON WASHINGTON <br />ST <br />Item <br />I <br />Description <br />QuantityPLFT <br />Unit Price <br />Total Amount <br />1. <br />....... <br />Pavement, Remove _._ <br />424 <br />......... <br />$42.50 <br />_- <br />$18,020.00 <br />2. <br />to <br />Curb, Concrete, Remove <br />155 <br />$25.00 <br />$3,875.00 <br />3. <br />Surface Miflin,g,Asphalt, 11/2 IN <br />�m <br />117 <br />$70.00 <br />$8,190.00 <br />4. <br />ra Tempory Inlet Protection <br />... ... <br />3 <br />..... <br />EA <br />... <br />$750.00 <br />5. <br />Tree, Remove <br />3 <br />EA <br />$250.00 <br />$750.00 <br />6. <br />Sidewalk, Concrete <br />294 <br />SYS <br />$78,50, <br />$23,079.00 <br />7„ <br />Li bt ofe Foundation <br />2 <br />EA <br />$985.00 <br />$1,970.00 <br />8. <br />Ornamental Light <br />2 <br />EA <br />$2,494.00 <br />$4,988.00 <br />9. <br />Handhole <br />1 <br />EA <br />�$1,206.00 <br />$1,206.00 <br />10. <br />NO.4 Wire <br />155 <br />LFT <br />$6.20 <br />$961.00 <br />11. <br />NO. 6 Wire <br />155 <br />LFT <br />$5.20 <br />$806.00 <br />12. <br />Conduit, PVC, 2IN, Schedule 80 <br />150 <br />LFT <br />�$9.00, <br />$1,350.00 <br />13. <br />,Construction Engineering <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />14. <br />Mobilization/Demobilization <br />1 <br />LS <br />$6,550.00 <br />$6,550.00 <br />15. <br />Maintain Traffic (MOT) <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />16. <br />Concrete Overlay <br />F...W. <br />26 <br />SYS <br />$65.50 <br />$1,703.00 <br />_W <br />.�.m.._W <br />17n <br />of Main St. Entrance slab <br />�$107.00 <br />$1,605.00 <br />18. <br />HMA Base, Type 8 <br />9 <br />Ton <br />.... $260.00 <br />$2,340.00 <br />19. <br />HMA Surface, Type B <br />Yp .. <br />11 <br />._ <br />Ton <br />$620.00 <br />...._._ $6,820.00 <br />21. <br />PCCP For Approach, 6'' <br />92 <br />SYS <br />$109.75 <br />$10,097.00' <br />22, <br />Curb and Gutter, Concrete <br />191 <br />LS <br />$43.00 <br />$8,213.00 <br />_.. <br />23. <br />Line, Thermoplastic, Solid, White, 4in <br />_.... <br />200 <br />.... ..... <br />LFT <br />$1.07 <br />$214.00 <br />_0 <br />24. <br />Line, Thermoplastic, Solid, Yellow, 4in <br />34 <br />LFT <br />$2.00 <br />$68.00 <br />25. <br />Turn Arrow, Thermoplastic, White <br />1 <br />EA. ..... <br />r $145.00 <br />26. <br />n Light Stadard, Type A <br />g �Yp ......... <br />2 <br />EACH <br />$3,639.00 <br />$7,278.00 <br />27. <br />Tree Grate <br />3 <br />EACH <br />$g00.00 <br />$2,400.00 <br />