BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Lib.! t Tower Exterior Renovations
<br />Project No. 118-086R
<br />For Bids Due: January 22, 2019
<br />Contractor Name: THE ROBERT HENRY CORPORATION
<br />BASE BID: DIVISION D: SIDEWALK AND CURB REPLACEMENT
<br />WORK
<br />ON WASHINGTON
<br />ST
<br />Item
<br />I
<br />Description
<br />QuantityPLFT
<br />Unit Price
<br />Total Amount
<br />1.
<br />.......
<br />Pavement, Remove _._
<br />424
<br />.........
<br />$42.50
<br />_-
<br />$18,020.00
<br />2.
<br />to
<br />Curb, Concrete, Remove
<br />155
<br />$25.00
<br />$3,875.00
<br />3.
<br />Surface Miflin,g,Asphalt, 11/2 IN
<br />�m
<br />117
<br />$70.00
<br />$8,190.00
<br />4.
<br />ra Tempory Inlet Protection
<br />... ...
<br />3
<br />.....
<br />EA
<br />...
<br />$750.00
<br />5.
<br />Tree, Remove
<br />3
<br />EA
<br />$250.00
<br />$750.00
<br />6.
<br />Sidewalk, Concrete
<br />294
<br />SYS
<br />$78,50,
<br />$23,079.00
<br />7„
<br />Li bt ofe Foundation
<br />2
<br />EA
<br />$985.00
<br />$1,970.00
<br />8.
<br />Ornamental Light
<br />2
<br />EA
<br />$2,494.00
<br />$4,988.00
<br />9.
<br />Handhole
<br />1
<br />EA
<br />�$1,206.00
<br />$1,206.00
<br />10.
<br />NO.4 Wire
<br />155
<br />LFT
<br />$6.20
<br />$961.00
<br />11.
<br />NO. 6 Wire
<br />155
<br />LFT
<br />$5.20
<br />$806.00
<br />12.
<br />Conduit, PVC, 2IN, Schedule 80
<br />150
<br />LFT
<br />�$9.00,
<br />$1,350.00
<br />13.
<br />,Construction Engineering
<br />1
<br />LS
<br />$2,500.00
<br />$2,500.00
<br />14.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$6,550.00
<br />$6,550.00
<br />15.
<br />Maintain Traffic (MOT)
<br />1
<br />LS
<br />$2,500.00
<br />$2,500.00
<br />16.
<br />Concrete Overlay
<br />F...W.
<br />26
<br />SYS
<br />$65.50
<br />$1,703.00
<br />_W
<br />.�.m.._W
<br />17n
<br />of Main St. Entrance slab
<br />�$107.00
<br />$1,605.00
<br />18.
<br />HMA Base, Type 8
<br />9
<br />Ton
<br />.... $260.00
<br />$2,340.00
<br />19.
<br />HMA Surface, Type B
<br />Yp ..
<br />11
<br />._
<br />Ton
<br />$620.00
<br />...._._ $6,820.00
<br />21.
<br />PCCP For Approach, 6''
<br />92
<br />SYS
<br />$109.75
<br />$10,097.00'
<br />22,
<br />Curb and Gutter, Concrete
<br />191
<br />LS
<br />$43.00
<br />$8,213.00
<br />_..
<br />23.
<br />Line, Thermoplastic, Solid, White, 4in
<br />_....
<br />200
<br />.... .....
<br />LFT
<br />$1.07
<br />$214.00
<br />_0
<br />24.
<br />Line, Thermoplastic, Solid, Yellow, 4in
<br />34
<br />LFT
<br />$2.00
<br />$68.00
<br />25.
<br />Turn Arrow, Thermoplastic, White
<br />1
<br />EA. .....
<br />r $145.00
<br />26.
<br />n Light Stadard, Type A
<br />g �Yp .........
<br />2
<br />EACH
<br />$3,639.00
<br />$7,278.00
<br />27.
<br />Tree Grate
<br />3
<br />EACH
<br />$g00.00
<br />$2,400.00
<br />
|