My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Liberty Tower Exterior Renovations Project No 118-086R - Midland Engineering Company Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Liberty Tower Exterior Renovations Project No 118-086R - Midland Engineering Company Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:48:14 AM
Creation date
1/24/2019 8:40:09 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 20, 2013 0 <br />To., Midland Engineering Co. NST <br />Attn: Tien Sage <br />52369 SA. 933 N. WILES <br />South Bend, IN 46637 S <br />From; Jeremy D, Waller TANK* <br />Director of Operations &AVk a s <br />Niles Steel Tank Company (NM <br />1701-A Terminal Rd, <br />Niles, MI 49120 <br />Dear Mr, Sage, <br />I aria wAtI08 this letter with ImTeet to tlae work, that has been completed by Midland D%ineeaing Comfy <br />on the N T facllity at the address listed Oxwe, Orr current facility was constructed in 1969 and has gone <br />through many upgrades and revisions since its inception. Of the 100,000 square feet of raararar,rlrtctartln;g arm <br />we eurrentlyhave under roof all Im been through its share of upgrades, All ofthis except, of course, the <br />roofftig system, <br />e tvg an the task of cornpl4ig the new roof with Midhaid 11:&eering Conapmy In 2011 mid as of this <br />letter data we are finally finished with all renovations to the roofing system, I will spry &t Midland <br />Engincering Company has been one of the best p iners I have been involved with on such a large scale, . <br />and long term, project. <br />I would like to corrunend Midland 'l aginecring Corral ny on its communication skills. I was awwe of. <br />every aspect of this project from start to fuaLsh. andtruly tiny felt comfortable with each step of the process, From <br />the office persortrael to the field teohniclatis, It was holy demonshided that Midland Iris not only the <br />experiencewtperience and quality to complete the jobs on time, but to keep all key personnel involved through the <br />entirety of the project. Ali personnel I have land coat of with at Midland wom kind, informative, <br />1nofe sionalande tremelyknowi lge,^able. <br />Mr. Sage, thank you for Assisting NST with our rooting system upgrade and feel free to utilize me as a. <br />reference anytime, It was a pleasure pa hm ing with lvlidland Engineering Company And well look to you <br />again: when the need arises. <br />Most Sincerely, <br />Jeremy D: Waller <br />Director of Operations/Quality Control Manager <br />Niles Steel Tank Company <br />1701 erraainal Rd. - RO Pa V 728# X110s, Affebleens 1,20 % 269, 83. f 1 . °r 09-033953 * 1t � �rlfarssP^� �s✓ax <br />
The URL can be used to link to this page
Your browser does not support the video tag.