Laserfiche WebLink
WiK <br />12675 Marlin Drive Redford, Mi. 48239 � Voice: 734.261.1930 f, Fax. 734.261.5590 <br />Date: 1/18/2019 <br />To: City of South Bend, IN <br />Re: Sections I — III (Part II) for the Liberty Tower Project <br />Section I <br />1. 2017 completed projects: A) C.H.U.H School District — new construction <br />B) Historic Blue Bell Lofts — historic window replacement <br />C) 45 W. Grand River — historic window replacement <br />D) Clark Lofts — historic window replacement <br />E) Simpson Hall — window replacement <br />F) Washington Tower — window replacement <br />2. N/A <br />3. N/A <br />4. References — attached <br />Section II <br />Proposed work plan: The initial step in the demolition package would be to identify all wall, window, and door <br />locations to be removed. Once the demolition is complete, the next step will be the layout of all new wall, <br />window, and door locations to be installed. This step would be working directly with the masons to install the <br />new brick and we would then install the wall frames accordingly. Next step would be to install all window and <br />door frames and conclude with glass and hardware. The time frame for section C is at 2-3 months. <br />N/A <br />N/A <br />Equipment — 2 scissor lifts. <br />Material quotes — Yes, we have received priced quotes to prepare our proposal. <br />Section III <br />1. Bidder's financial statement — it is attached. <br />Any questions regarding this matter, please feel free to contact us at (734) 261-1930. Thank you! <br />Respectfully, <br />Matthew D. Tabar <br />Environmental Glass, Inc. - Estimator <br />