My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Liberty Tower Exterior Renovations Project No 118-086R - Environmental Glass, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Liberty Tower Exterior Renovations Project No 118-086R - Environmental Glass, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:46:53 AM
Creation date
1/24/2019 8:39:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WiK <br />12675 Marlin Drive Redford, Mi. 48239 � Voice: 734.261.1930 f, Fax. 734.261.5590 <br />Date: 1/18/2019 <br />To: City of South Bend, IN <br />Re: Sections I — III (Part II) for the Liberty Tower Project <br />Section I <br />1. 2017 completed projects: A) C.H.U.H School District — new construction <br />B) Historic Blue Bell Lofts — historic window replacement <br />C) 45 W. Grand River — historic window replacement <br />D) Clark Lofts — historic window replacement <br />E) Simpson Hall — window replacement <br />F) Washington Tower — window replacement <br />2. N/A <br />3. N/A <br />4. References — attached <br />Section II <br />Proposed work plan: The initial step in the demolition package would be to identify all wall, window, and door <br />locations to be removed. Once the demolition is complete, the next step will be the layout of all new wall, <br />window, and door locations to be installed. This step would be working directly with the masons to install the <br />new brick and we would then install the wall frames accordingly. Next step would be to install all window and <br />door frames and conclude with glass and hardware. The time frame for section C is at 2-3 months. <br />N/A <br />N/A <br />Equipment — 2 scissor lifts. <br />Material quotes — Yes, we have received priced quotes to prepare our proposal. <br />Section III <br />1. Bidder's financial statement — it is attached. <br />Any questions regarding this matter, please feel free to contact us at (734) 261-1930. Thank you! <br />Respectfully, <br />Matthew D. Tabar <br />Environmental Glass, Inc. - Estimator <br />
The URL can be used to link to this page
Your browser does not support the video tag.