Laserfiche WebLink
3. Discharge Screening Level Limitations have been established to evaluate the need for a <br />limitation for pollutants that are not listed in the Effluent Limitation section of the permit. <br />If a permittee has no limit for a particular pollutant, but observes, through monitoring <br />and analysis, a concentration of that pollutant greater than the listed Discharge Screening <br />Level concentration found in the table below, the permittee shall notify the Control <br />Authority. This notification shall be made in writing within five days of observing the <br />pollutant concentration. <br />Parameter <br />Daily Maximum Screening Level (mg/L) <br />Arsenic (mg/L) <br />0.2 <br />Cadmium (mg/L) <br />0.1 <br />Chromium (mg/L) <br />2.0 <br />Copper (mg/L) <br />0.3 <br />Lead (mg/L) <br />_ 0.3 <br />Nickel (mg/L) <br />0.3 <br />'Silver (mg/L) <br />0.2_ <br />`itic (mg/L) <br />0.3 <br />St. Joseph Energy Center Industrial Wastewater Discharge Permit page 3 of 39 <br />