Laserfiche WebLink
To: Joe Nucciarone <br />ALLIANCE ARCHITECTS <br />929 LINCOLNWAY EAST <br />SUITE 200 <br />SOUTH BEND, IN 46601 <br />Ph:(574)288-2052 Fax:(574)288-2550 <br />E-Mail: jucciarone@alliarch.com <br />I IS <br />Request for Information <br />MUNNOMMI <br />RFI #: 26 <br />Date: 11121 /2018 <br />L-D Job #: 56- 445 <br />Project: HOWARD PARK -REDEVELOPMENT <br />CC: Myron Cohaqan (LOCHMUELLER GROUP), Villa; Toy (SOUTH BEND, CITY OF) <br />Subject: Perimeter Insulation at Basement <br />Drawing: 1 /A5.8 <br />Cost Impact: <br />Spec Section: 072000 <br />Schedule Impact None <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph : 219-362-2127 <br />Fax:219-362-2848 <br />Request: Date Required: 11/26/2018 <br />Rigid insulation is shown installed horizontal under the walk just outside the building line but is NOT shown on the perimeter of the <br />basement wall in detail 1/A5.8. A similar detail 3/A5.8 shows rigid insulation down the perimeter of the wall. Is rigid insulation only <br />needed installed horizontal as shown or is insulation required vertical along the basement perimeter wall? Please advise <br />Requested by: Darin Meyer <br />LARSON-DANIELSON CONST. CO INC <br />Response: <br />FIIFII.::F:II..IIC D E..I..�II- I /5 11 8, II 1:II::IIII"'III � �N S J JII. ..IIIN ( IfR '1 <br />TO T LU � S II DII.::: 0II..1 I F 0LJ\I 1 ..I.. 0 II 1 W AII. II_S � M � L AIf: 0 DII_..�.. IIII........ 3 / 8 (2" IZIGIIIf:: <br />,Joe II" ucdiaimiii, II:R <br />Answered by <br />Company Date <br />PJ RFI Form 1 (7) (CR) Page 1 of 1 <br />