My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Howard Park Redevelopment and St Louis Blvd Improvements Project No 117-047B - Larson Danielson Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - Howard Park Redevelopment and St Louis Blvd Improvements Project No 117-047B - Larson Danielson Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:56:39 PM
Creation date
1/24/2019 8:25:48 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
929 Lincolnway East, Suite 200 1 South Bend, Indiana 46601 <br />CONSTRUCTION CHANGE DIRECTIVE <br />DIRECTIVE NO.: 1 TO: Larson Danielson <br />302 Tyler Street <br />PROJECT: HOWARD PARK REDEVELOPMENT La Porte, IN 46350 <br />219 South St. Louis Blvd. <br />South Bend, IN 46617 <br />CONTRACT DATE: October 4, 2018 <br />OWNER: CITY OF SOUTH BEND <br />SOUTH BEND VENUE, PARKS <br />AND ARTS <br />301 South St. Louis Blvd. <br />South Bend, IN 46617 <br />DATE OF ISSUANCE: November 8, 2018 <br />ARCHTECT'S PROJECT NO: 072 <br />You are hereby directed to make the following change(s) to the Drawings and/or Specification: <br />1.01 Add Sheet P1.2B: <br />A. Reference Supggrt Fa <br />ci(it Ground floor DWV Plan ...Change the following: <br />1. Add sump pump to Water Tank Pit as shown. <br />Sump Pump: Unilift AP12; Product No. 96011036; Pump Type: Unilift <br />AP12.40.04.1 <br />2. Add 2" VTR from water tank through First Floor plumbing chase. Reference <br />Sheet Q3.1. <br />1.02 Add Sheet E2.OA : <br />A. Reference Sul2gort Facility 'Lower Level Power Plan ...Change the following: <br />1. Add power to new Water Tank sump pump. <br />The Contractor shall proceed with the change(s) described above. The Architect shall prepare a Change Order <br />document, if necessary, to adjust the Contract Sum and/or Contract Time for changes reflected herein. <br />End of <br />Construction Change Directive No. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.