Laserfiche WebLink
Board met in regular session at 10:00 A.M, Mr. A. H. Rice, absent. <br />Bids were -received, opened and read on the following* improvements. <br />Chestnut Street wipe sewer. <br />Bid of Staples & Ackerman. <br />10 inch pipe sewer, per lin ft......................$1.60 <br />8 inch pipe sewer, per lin ft....'.................. .60 <br />6 inch cnduit pipe sewer, lin. ft................... .65 <br />° per ft­' in depth . 5.00 <br />Manholes, pt ......................... <br />Manhole, curbs and covers, each** ... 000 ............ 14.00- <br />Storm ;pater inlets, each ........................... 6.00 <br />Howard Street, pipe sewer. <br />A, -Bid of Staples & Ackerman, <br />12 inch pipe sewer, Pr lin ft................... .$1.95 <br />8 inch pipe sewer, per lin ft;.................0.. .60 <br />6 inch pipe sewer, per lin ft..................... .70 <br />Manhole, per ft. in dei)th......s................ a 5.00 <br />Manholes, curbs and covers, each.................14.00 <br />Storep water inlets, each ........................ 6.00 <br />Bid of Hoban & Roach. <br />12 inch pipe sewer, perlin ft............ .. ...$ 2.00 <br />8 inch pipe sewer, per lin ft................... .50 <br />6 inch pipe sewer, per lin ft............. .70_ <br />Manholes, curbs and covers, each..................13.00 <br />Manholes, p�r ft. in depth .....................••• 4.50 ° <br />Storm water inlets, each .......................... 6.50 <br />Dunn Street pipe sewer. <br />'-id of Hoban & Roach. <br />12 " pipe sewer, per lin ft........................ 1.75 <br />8 inch pipe sewer, per lin ft.................... .50 <br />6 inch pipe sewer, per lin ft..... .70 <br />° Manholes, per. ft.., in depth....... ....... 4.50 <br />Manholes, curbs and covers, each ................. 13.00 <br />Storm water inlets, each ......................... 6.50 <br />Bid of Staples & Ackerman. <br />12 inch pipe sewer,pr lin ft. ...................$1.70 <br />8 .inch pipe , per lin ft........... _ ........... .60 <br />6 inch pipe sewer, per lin ft.................... .70 <br />Manholes, curbs and covers, each................14.00 <br />Manholes, per ft. in depth.............. ........ 5.00 <br />Storm water inlets each ........................ 6.00 <br />All of the above bids were refeered to the City engineer for tabulation <br />to be reported on at 7: 45 P. M. this 31st . , day of July 1917. <br />Partial estimate allowed The W. B. Brady Construction Company <br />bn Pavement Improvement on Franklin Street from Indiana Avenue to Calvert Street, <br />at..........................................$4,099.98 <br />Partial estimate allowed W. B. Brady Construction Company on pavement <br />improvement on La Porte Avenue from Washington Avenue to Linden Avenue at.....$860.87 <br />Partial estimate allowed W. B. Brady Construction Company on <br />pavement improvement on Leer Street from Lincoln Way East to Calvert St. at ... <br />$1,182.50 <br />Partial estimate allowed Staples & Ackerman on pipe sewer improvement <br />-on Carroll, Fellows, Martietta, and Rush Street from Braodway Street to Indiana Avenue <br />at..................................................................... 0... $1,325.00 <br />Grade of Campau Street from Arthur Street east to city limits <br />was approved by the Board. <br />