Board met in regular session at 10: 00 A.M. All members present.
<br />- o
<br />'Bids were received opened and read.as follows:-
<br />` Pipe'sewe°rs, on Chapin, Garst and Kendall Streets,
<br />Bid of Staples & AckgrEaa , _ , . o .
<br />24 irAh p ipe s ewer ; ' die r lin ft ................... $3.0 0
<br />10 . inch pipe > sewer,, -per 1 ire f t ......_ 6 ............... 2.60
<br />15 inc h p ipe sewer, p r lin ft ...................... 1.95
<br />12 inch pipe sewer, per lin�ft...................... 1.75
<br />8 inch pipe sewer, per lin ft................. • : • ... .60
<br />6 inch pipe . sewer, per lin ft ♦ ............... • • . • .....70
<br />Manholes , per f pot , in.depth ..........................4.25
<br />Manhole, curbs and covers, each.... ...... *.*.13.00
<br />Storm water inleti, each ............................ 7.00
<br />Extra • 8 -X :12-,Vs ° r:................................. 2.00
<br />Flush Tanks, complete.............................150.00
<br />Mr. . I. Staples appee;red before the Board in regard to leav ing
<br />b id out on 18 inch Ipi s-,.bmtted on above , improvement. The Board instructed 14r.
<br />Staples to get an affidavit from others contracts and the Board would consider his
<br />b id .
<br />Bid of Hoban .& Roach.. , .. ,
<br />`24 inch'pipe sewer, 'per lin ft.....................4 3.60
<br />:�0`in6h'pipe 6ewer;°per' lin ft...:.................. 2.75
<br />18 inch pipe sewer, per lin ft...................... 2.30
<br />15 inch pipe sewer, per lin ft...................... 2.05
<br />12 inch pipe sewer, per'lin ft...................... 1.75
<br />8 inch pipe sewer, per lin ft.................♦..... .45
<br />5 inch pipe sewer, per lin ft....................... .65
<br />Manhole, per ft. in depth ............................ 4.00
<br />Manhole, curbs and covers, each ...................... 13.00
<br />Storm,water inlets;°each .......................•...0. 6.50
<br />S"•Flush Tanks,.,:.:.i................................ 125.00
<br />6" Flush tanks, each ..................... 100.00
<br />Bid of Bruno De Peape.
<br />24 . inch pipe ,sever, peiz.lin ft....................... 4.00
<br />20.inch.pipe sewer, per lin ft....................... 3.50
<br />.18 . inch .pipe sewer, ,per , lin ft........................ 3.30
<br />15 inch pipe sewer, per lin ft....................... 1.70
<br />12 inch Jipe sewer, per lin ft.** .... ......... 1.50
<br />10 inch pipe sewer, per lin ft....................... .60
<br />6 inch pipe sewer, per lin ft....................... .80
<br />Manholes, per ft. in depth ........................... 4.50
<br />Manholes, curbs and covers, each ..................... 14.00
<br />Storm water inlets, each ............................. 8.00
<br />Flush Tank, each.....................................130.00
<br />3-12 inch to curb ..................................... 1.60
<br />2 -15 inch to curb .............. :..................... 1.80
<br />1 -6 inch to property line ........................... .70
<br />8 -8 X 12 Yes ......... ..•......... ..♦•••••••••••••••• 1.00