<br />Board met in regular session at 10:00 A.M. All members present.
<br />a
<br />Bids were received, opened and read as follows: -
<br />Bid on Pavement on 2nd. alley west of Lafayette
<br />Blvd. from Colfax Avenue to Lincoln Way West.
<br />B id of H. N. Barnes °
<br />Seven inches concrete pavement , per sq. yd.......,...............1.44
<br />Resetting manholes, each .......................................... 2.00
<br />Pipe sewer on Donald Street from Miami Street to
<br />East line of South E. Add.
<br />Bid of Bruno De Pea,pe '
<br />12 inch pipe sewer, er lin ft.........:..:........:...............$1,65
<br />10 inch pipe sewer, per lin ft.......... .......................... 1.50
<br />8 inch pipe sewer, per in ft...................................... .60
<br />6 inch pipe sewer, per lin ft..................................... .70
<br />Manholes,_ per lin ft. in depth ................°.,................... 4.50
<br />Manholes,, curbs and covers, each...................................14.00
<br />Storm water inlets complete........... 8.00
<br />B id of Roba,n & Roach.
<br />12 inch pipe sewer, per lin ft....................°......:......... 1.65
<br />10 inch pipe sewer, per lin ft..................................... 1.50
<br />8 inch pipe sewer, per lin ft..... .50
<br />6 inch pipe sewer, per lin ft..................................°.... .65
<br />Manholes,' per ft. in depth ..................... 0..................... 4.00
<br />Manholes,' curbs and covers, each..'.................. 0.............. 12.00
<br />Storm water inlets, each... ................ 6.00
<br />ri Bid of Staples & Aekermaipe sewer on Leer Street from Calvert to Ewing Ave.
<br />18 inch pipe sewer, per lin ft............................,..°...... 2.15
<br />3 jIT, ah pipe sewer, per lin ft..................................... 1.95
<br />8 inch .pipe sewer, per lin ft................................... .55
<br />6 inch pipe sewer, -per lin ft........................ ........... .70
<br />Manholes, per ft'. in depth, ........................... 4.00
<br />Manholes, curbs and covers, each .................................. 12.00_
<br />Storm water inlets, each .......................................... 5.00
<br />Pipe sewer on Donald Street.
<br />Bid of Staples & Ackerman .
<br />12 inch pipe sewer, per lin ft...,........................... ....
<br />1.70
<br />10 inch pipe sewer, per lin ft......................9............
<br />1.50
<br />/ 8 inch pine sewer, per lin ft.........................0.........
<br />.55
<br />v 6 inch pipe sewer , per lin dt...................................
<br />.70
<br />Manholes,, per ft. in depth .......................................
<br />4.00
<br />Manholes, curbs and covers, each.............................0...
<br />12.00
<br />Storm water inlets, each ...........................................
<br />5.00
<br />All of the above bids were referred to the City Engineer
<br />for tabulation
<br />to be reported at 7:,35.P.M. this 5th. day of June 1917.
<br />bar. C. W. Clapp appeared before the Board and requested
<br />permission to
<br />have sewer on Dayton Street extended from Marine Street to the alley
<br />east.
<br />Permissinn was granted to Mr. C. W, @lapp , with understanding that
<br />the same was to
<br />be under the supervision of the City Engineer and Mr. C. W. Clapp was
<br />to pay
<br />the cost of said extension.
<br />Mr. Courtland P, Du Comb appeared before the Board and filed petition
<br />for rebate on water meter. The same was referred to the City Water Department
<br />(� for investigation.
<br />The Beard ordered that a clock be purchased for.the Park Board office
<br />,11 from Chas. M. Schuekl at price submitted in bid at....................$7.50.
<br />The Board instructed the Street Commissioner to order L. H. VanderKa.rr
<br />Contractor on Street Asphalt repair work, to start on asphalt repair work in the
<br />city at one a. _