My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Traffic Control Device - All Way Stop Condition @ Wayne and St Louis
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Traffic Control Devices
>
Traffic Control Device - All Way Stop Condition @ Wayne and St Louis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 11:21:14 AM
Creation date
12/21/2018 11:11:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
12/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TH <br />BOARD OF PUBLIC WORKS <br />Request for Approval of <br />Traffic Control Devices) <br />Date: 12,/17/2018 Traffic Request Number: TR -- <br />I hereby submit the following installation or change of traffic control devices for review: <br />❑ New Installation ❑ Removal <br />®Revision <br />❑ Stop Sign ❑ Stop Sign ® Stop Sign <br />❑ Yield Sign ❑Yield Sign ❑ Yield Sign <br />❑ Speed Limit, _mph ❑ Speed Limit, _mph E] Speed Limit, _mph <br />❑ Other, List Other, List Other List <br />Wa e Street Stop at St. Louis Blvd. <br />Change to All -Way Stop Condition <br />Location(s): The intersection of St. Louis Boulevard and Wayne Street <br />This has been submitted: <br />❑ In response to request by a citizen/ neighbor/ passerby: <br />❑ In response to contracted reconstruction or improvements <br />❑ In response to developer -provided reconstruction or impra�venlent. <br />® In response to an internally -generated concern from Aaron Perri and VPA Staff at the Lodge in Howard Park <br />Remarks: The parking for the VPA Lodge building has been moved to the north east corner of Wayne St. and St. Louis <br />Blvd. and requires the Lodge users to cross this intersection. The BOPW has given approval for the plans to <br />make an --all-wa stop at this intersection_ with the new construction that will happen during the Summer of 2019, <br />elur T. Nawrot, PE, PLS� <br />A. sistant City 1:°,ngineer <br />Date: / 2-; // 7 Ab <br />APPROVED: SOUTH BEND BOARD OF PUBLIC <br />WORKS 7 <br />0 <br />u — .................... <br />Gary A. CiiY , 1 resident <br />ZSu-M. Fritzberg, Member <br />e- . <br />.lanaea..A Mueeller, Member <br />k AaRA 0 °Sc't_F I oq �j <br />Elizabeth A. Maradik, Member <br />,....Therese m.. �?b,,r' <br />ati, Mc� <br />ReConu ,n A j <br />Attest: <br />i da M. Martin, C 'i <br />Date <br />-)../ "k-D /r 0 /? <br />Distribution: <br />Bureau of Traffic and Lighting and the South Bend Police Department Traffic Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.