My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - VPA Restroom Remodeling Project No 118-043R - Larson Danielson Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - VPA Restroom Remodeling Project No 118-043R - Larson Danielson Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:48:43 PM
Creation date
12/21/2018 10:58:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLAN AND EQUIPMENT QUESTIONNAIRE <br />The Signatory of this questionnaire guarantees the truth and accuracy of all statements and of all <br />answers to interrogatories hereinafter made. <br />In what manner have you inspected this proposed work? Explain in detail. <br />Larson- Danielson estimatina) staff have thorouelilv reviewed and assessed the drawings <br />ands'oecifications provided foi�biddinp-Dtiri)osed�ogi,itl,�ii roject and have conuminicated <br />with subcontractors and sLippliers in evaluating the full scope of work for this Droject. <br />2. Explain your plan or layout for performing the proposed work. <br />Larsoii-Danielson anticipates commeiicing Project coordination upojLjg�qel t of a contract <br />Notice to Proceed, or Letter of Intent. We will then begin awarding, subcontracts based on <br />sequence of work to be performed in order to begin on -site construction as soon as — <br />possible. Work will be performed in common geaugice of tasks as it relates to this proiect <br />that provides for the best quality end product. <br />3. The work, if awarded to you, will have the personal supervision of whom? <br />A Proiect Manner and Superintendent will be assigned to this , �ro*eet �follow�in. <br />notification of the bid results. <br />*4. Do you intend to do the hauling on the proposed work with your own forces? <br />If so, give amount and type of equipment to be used. <br />If hatilina is needed, this is to be: deterinined following, notification of bid results unless <br />stated otherwise in supNeineiltal bid documents. <br />*5. If you intend to sublet the hauling or perform it through an agent, state amount of sub- <br />contract or agent's contract, and if known, the name and address of sub -contractor or agent, <br />amount and type of his equipment and financial responsibility: <br />If.haulipg is needed this is to be determined followin notification of bid results unless <br />stated otherwise in stipplemental bid documents. <br />Items 4, 5, 6 and 7 may not be applicable in all building contracts; if not, omit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.