Laserfiche WebLink
- <br />CITY OF SOUTH BEND, INDIANA ( "` <br />CONTRACTOR'S BID FOR PUBLIC WORK 1865 <br />Project Name Wastewater Treatment Plant Raw Sewage Pump No. 2 Rehabilitation <br />Project No. 118-020 <br />For Bids Due December 12, 2018 <br />PART <br />(Must be completed for all bids. Please type or print) <br />Date: 1; „ tA Bidder (Firm): �,.. c E? � c <br />Address: „ � t �".6 4� R tie OO"A <br />City/State/Zip: � = l w^t r -' ( Telephone Number: i3 7—70 <br />Agent of Bidder (if Applicable;): !fir° <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />_ Nm; , 2h <br />the City ofSouth Bend, Indiana, in accordance with plans and specifications prepared by: <br />zv,YY <br />and dated F _r 2-C) for the sum of (enter the Total Bid as shown on the Proposal) <br />(Enter sum of Total Base Bid 6hown on Proposal) (Numerical) <br />The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in <br />the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance <br />with the notice. Any addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that <br />shown in the original contract if accepted by the Ci�yof South Bend. If the bid is to be awarded on a unit <br />basis, the itemization of the units shall be showLKa e,parat ,a achment <br />BYE''., <br />(Signature) <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above bid is accepted this -�U <br />Subject to the following conditions: <br />ZR�i OF PUBLIC W I <br />l t, <br />Gary A. Gi o , President <br />zab h A. Mar' ,, ber <br />,la e�all Member <br />L-p, vr,.ti ®.dud(; <br />day of 20 ly <br />-Su z nna M. _ zb ei g, Mem er <br />Therese J. Dorau. Me er <br />.. <br />4Atst: Linda M. Martin, Clerk ' <br />Version 7/20/2018 Contractor's Bid for Public Works - 2 <br />