My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Olive Production Well No 6 Rehabilitation Project No 118-102 - Peerless Midwest Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 1 - Olive Production Well No 6 Rehabilitation Project No 118-102 - Peerless Midwest Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:40:17 PM
Creation date
12/21/2018 10:46:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />TftDEPARTMENT OF PUBLIC WORKS <br />M <br />DIVISION OF ENGINEERING <br />TO: Kara Boyles, City Engineer <br />FROM: Becca Plantz, Engineer I j p <br />SUBJECT: Olive Production Well #6 Rehabilitation - Change Order No. 1 <br />DATE: 12/18/18 <br />:; v xmmwwmmamm�mwmrvm�m� mw�wuouwaw. a ,000w wuuw muriw�wiuww.wuwwwuwwwww wuwvr uswuuw�m iww�o�.a.�amareoummmmm mw w�w�,.r000mmroow.........Mi0000wwmwvo n�umm��mn n nn n acemwmn rArwwn nnnm�uwmm�r� <br />��r•o ���ct^fin <br />The Olive Production Well #6 Rehabilitation Project was awarded to Peerless Midwest for <br />$50,930.00 on November 27, 2018. The project entails the removal of the pump, a pre -cleaning <br />video, cleaning, replacement, or refurbishment of pump parts, a post -cleaning video, and the <br />installment of the rehabilitated pump in the clean well. <br />Project U date &Timeline <br />A meeting on December 14, 2018 was held at Peerless Midwest to review the pre -cleaning video <br />and discuss next steps. While reviewing the pre -cleaning video, 100% full screens and three feet <br />(3 ft) of sediment that is assumed to be iron settling from the screens was noted at the bottom of <br />the well. It was advised and agreed on to air-lift the sediment from the well for pump protection <br />purposes. After the review of the video, the removed pump parts were viewed in shop for a <br />visual of the rehabilitation to be done. It was noted the condition of this well and pump are in <br />poor condition as it has not been serviced in about 18 years. There is also the condition of not <br />knowing the extent of rehabilitation until the pump is pulled. <br />tigngeOrder <br />A change order totaling $12,307.00 is requested to cover the additional parts needed for <br />rehabilitation of the pump and the air-lift method to remove iron build up from the well. This <br />creates a 24% change to the original contract of $50,930.00. The new contract amount is <br />$63,237.00. <br />We deliver services that empower everyone to thrive!! <br />
The URL can be used to link to this page
Your browser does not support the video tag.