My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Edison Production Well No 2A Rehabilitation Project No 118-103 - Peerless Midwest
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 1 - Edison Production Well No 2A Rehabilitation Project No 118-103 - Peerless Midwest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:36:01 PM
Creation date
12/21/2018 10:45:31 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�tt l"NC,E� <br />CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />180 <br />TO: Kara Boyles, City Engineer <br />FROM: Becca Plantz, Engineer I Q-Q <br />SUBJECT: Edison Production Well #2A Rehabilitation - Change Order No. 1 <br />DATE: 12/18/18 <br />r�nar,�wuww!uv�rwuurrm�m�m;�rw..w... mmmw.�,.m�u�uuwNmwnu�u�www�uuwu�.wuw uummo�wv mo uuo mwuuuu�e oo umoumimimio ���u�mmowumrouwmme�oowru�w.... uwa nuewwrm�.. mrumnu��rrrmu �o�R mm�Mmmaw�s�nrtvprv�rosvmvmuwwmw��wmmumm�uwGuru�mmvamrou�o�.:o�u�;wuwr:.. <br />Prodect Description, <br />The Edison Production Well #2A Rehabilitation Project was awarded to Peerless Midwest for <br />$49,991.00 on November 27, 2018. The project entails the removal of the pump, a pre -cleaning <br />video, cleaning, replacement, or refurbishment of pump parts, a post -cleaning video, and the <br />installment of the rehabilitated pump in the clean well. <br />fro ject d/ e & Timeline <br />A meeting on December 14, 2018 was held <br />at Peerless Midwest to review the pre - <br />cleaning video and discuss next steps. After <br />the review of the video, the removed pump <br />parts were viewed in shop for a visual of <br />the rehabilitation to be done. The condition <br />of the carbon shaft (Figure 1) was <br />irreplaceable, and needs to be replaced with <br />a longer lasting stainless steel shaft. The <br />shafting in this application was also <br />oversized for the application. As such, the <br />stainless steel shaft to replace the removed <br />carbon shaft will have a lesser diameter. <br />Increased funds are requested in addition to the $3,000.00 allowance. It was noted the condition <br />of this well and pump are in poor as it has not been serviced in about 18 years. There are also <br />unforeseen conditions that until the pump is pulled are not predictable. <br />Change Order <br />A change order totaling $13,149.00 is requested to cover the additional parts needed for <br />rehabilitation of the pump and the stainless steel shaft replacement. This creates a 26% change to <br />the original contract of $49,991.00. The new contract amount is $63,140.00. <br />We deliver services that empower everyone to thrive!! <br />
The URL can be used to link to this page
Your browser does not support the video tag.