Laserfiche WebLink
INTER -OFFICE IIMEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENVIRONMENTAL SERVICES <br />TO: Members of the Board of Public Works <br />Clara McDaniels, Assistant City Attorney Public Works <br />Linda M. Martin, Clerk <br />FROM: Sue Ellen Doudrick, P.E., Assistant City Engineer <br />SUBJECT: Project No. 118-063 Small Drainage Design & Repair <br />DATE: December 18, 2018 <br />u�ntrvario�ni�^n unrc�wd�.ww:amv „u rtr, mtaa[r w;drv9,w rv�amam��srvnrmnr�v �rrr dmmau Asrrer�u� uun��uwa�,�mr enm� �rra.vuu ir��wwRwmi uw�uourer,;�e�mw�r,�w,mrtiw�rn�w imxswaa.rn�. i era... mu ov en.mv�a.mriaeni�aaurartsn�ut rvu�awa✓�ra,�wwr,^: �a <br />On December 11, 2018, the Board of Public Works opened and read bids for the above project. <br />The Division of Engineering the documents and found the information correct and complete. <br />The project was a divisible bid, which could be awarded to the lowest, responsive, responsible, <br />pre -qualified bidder. The project will be awarded to the highlighted contractors shown below: <br />Bidder Division A: Division B: Division C: <br />Hawbaker Street Olivia Circle (2) Creekwater (2) <br />Marshall.._ ............. ........ m.$135,628'.00�� $1 22,128.00$94.......................................rr <br />,133.00 <br />2. Selge Construction $163,241.83 $104,768.28 $87,234.00 <br />3. Walsh & Kelly $144 895.50 $140 000.00 $72,200.00 <br />Notes. $188,568.50 $121,457 00 $111,162.00 <br />1. GE Marshall will be awarded Division A for $135,628.00 out of the SS TIF account. <br />2. Selge Construction and Walsh & Kelly will be awarded Division B ($104,768.28) and Division C <br />(Zi-spectively, out of the LRSAwAccount Number 251.0608.431 42 96. <br />The Division of Engineering recommend the award of the contract for Project No. 118-06 <br />Small Drainage Design; & Repair to the lowest, responsive, responsible, pre -qualified bidder, <br />CIF Marshall Sel a Construction, and Walsh & Kelly at the bid price highlighted above. This <br />recommendation includes the acceptance of bids on base Divisions A, B, and C. No alternates <br />will be awarded. <br />The project will be funded as described in the table above. <br />For questions regarding the above recommendation or the subject project, contact Sue Ellen <br />Doudrick (Ext. 5922) at the Division of Engineering. <br />