Laserfiche WebLink
ALTERNATE B2 — FREMONT PARK IMPROVEMENTS — FULL LANE MILLING <br />Item No. <br />Description <br />Quantity <br />Unit Unit Price <br />Total Amount <br />1 <br />Surface Milling, Asphalt, 1 1/2 IN <br />1600 <br />SYS $4.60 <br />$7,360.00 <br />2 <br />HMA Surface, Type B <br />130 <br />TON $116.00 <br />$15,080.00 <br />ALTERNATE B2 - TOTAL $22,440.00 <br />ALTERNATE B3 — FREMONT PARK IMPROVEMENTS —SIDEWALKS, <br />Item No. Description <br />CURB RAMPS AND CROSSWALKS <br />Quantity Unit Unit Price j <br />Total Amount <br />1 <br />Excavation, Common <br />40 <br />CYS <br />$150.00 <br />$6,000.00 <br />2 <br />Tree, Remove <br />2 <br />EA <br />$1,974.50 <br />$3,949.00 <br />3 <br />Sidewalk, Concrete, 4 IN <br />590 <br />SYS <br />$40.20 <br />$23,718.00 <br />4 <br />Curb Ramp, Concrete <br />28 <br />SYS <br />$148.00 <br />$4,144.00 <br />5 <br />Modified Combination Curb, Concrete <br />17 <br />LIFT <br />$87.00 <br />$1,479.00 <br />6 <br />Thermoplastic Crosswalk, Solid, White, 6 IN <br />180 <br />LFT <br />$8.00 <br />$1,440.00 <br />7 <br />Hydro -mulch Seeding, Mix <br />1060 <br />1 SYS <br />1 $14.50 <br />1 $15,370.00 <br />Bidder (Firm): <br />Address: <br />City/State/Zip: <br />ALTERNATE B3 —TOTAL <br />TOTAL DIVISION A + B + 131 + 132 + 133 <br />Walsh & Kelly, Inc. <br />24358 SR 23 <br />South Bend, IN 46614 <br />Addendum 1 & 2 <br />\(` Y <br />c <br />WW <br />SAIN <br />0;04 I 1 <br />ilr <br />$56,100.00 <br />$337,240.00 <br />,tin Hilary VP of South Bend Area <br />(Printed Name of Person Signing) <br />