My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Colfax Water Works Building Repainting Project No 118-055 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotes - Colfax Water Works Building Repainting Project No 118-055 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:43:00 AM
Creation date
12/12/2018 1:22:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c�ti m as <br />J' <br />CITY OF SOUTH BEND, INDIANA �Md <br />CONTRACTOR'S QUOTEEOR PUBLICIWORK <br />PROJECT NAME: Colfax Water Works Building Repainting, <br />PROJECT NO. 118-055 <br />QUOTES DUE December 11. 2018. 9:30AM Local Time <br />(Must be completed for all quotes. Please type or print) <br />Date: December 11, 2018 Firm: Ziolkowski Construction, Inc. <br />Address: 4050 Ralph Jones Drive <br />City/State/Zip: South Bend, IN 46628 Telephone Number: 574 287-1811. <br />Agent of Bidder (if Applicable): _ n/a <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Colfax Water Works Buildin Repainting <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by� <br />The City of South Bend Department of Public Works <br />and dated November 16 2018 1 for the sum of (enter the Total Quote as shown on the Proposal) <br />Forty Five Thousand Two Hundred Fifty ($ _45 250 <br />(Enter Sum of Total Quote plus Alternate shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />By74461, <br />(Signature) <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />day of 20 <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />Version 10/31/2017 Page - 9 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.