My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:35:09 AM
Creation date
12/12/2018 1:18:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ULF <br />Currently the project is slated fora March 2020 letting. The scope <br />of the work will include the reconstruction of 0endix Drive from <br />just north of Lathrop Road to the south end of the bridges over the <br />Indiana Toll Road. Incidental work includes replacement of several <br />concrete approaches at Viridian Drive. Rosetta Place, Council Oak <br />Drive, Boland Drive, Sugar Maple Lane, Nirntz Parkway, rehabilitation <br />orsmaller drive apprmi0)es^and 546 LF[pfpavement restrip|ngnear <br />theLathrop Street intersection (see map on Page 5). <br />The typical roadway section ofthe 0endk/Drive mainline will include <br />two 11-fVcdconcrete travel lanes, with a12-footcenter turn/auxiliary <br />lane. The mainline pavement cross section will consist of10inches of <br />PCCR on six inches co^np�',�cted aggregate base, on treated sVb0rade. <br />Drainage will becontrolled through the use ofthe existing stormsewer <br />and inlets, and through storMn sewer upgrades throughout the project <br />limits, imClUdimgt1le instaHatimnofnew ¢omcrete curb andgmttel% <br />Due to the significant roadway conatnucdon, erosion control and <br />site drainage must be mon|tored, antidpated, and controlled at all <br />times. We expect multiple temporary erosion control measures will <br />he implemented and maintained throughout construction. SWtfence, <br />ripnap, check -clams, rook bermoS, Sedirment traps. temporary seeding <br />�n�mum��hi��end#ewaterimg statiomswWUbeincorporated throughout <br />the i)r0ject limits and at any discharge sites, <br />Work on the Banc[N Drive corridor will also include signalized <br />intersection in'iprovements at Boland Drive and Sugar Maple <br />Multiple plantings will be placed throughout the limits. Placemeni <br />must be coordinated with overhead utilities, gas services, and the <br />local Parks Department. <br />Letter of Interest to Provide Construction Inspection Services I Reconstruction of Bendix Drive � �1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.