My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - Lawson Fisher Assoc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - Lawson Fisher Assoc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:34:37 AM
Creation date
12/12/2018 1:16:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Miami Road from Kern Road to Jackson Road <br />Added Travel Lanes - City of South Bend, <br />Indiana <br />LFA provided construction inspection services for the <br />reconstruction and widening of Miami Road between Jackson <br />Road and Kern Road including significant utility relocations, <br />new storm sewer construction, curb and gutters, sidewalks, <br />drives, traffic signal installation, QA/QC PCCP paving <br />and coordination of local detour and maintenance of traffic <br />operations with South Bend Community School Corporation. <br />Project issues included extensive utility conflicts and resident <br />access coordination. LFA ensured coordination with local <br />residents for proper advanced notification of alternate routing <br />of access for homeowners, <br />LFA provided complete construction inspection services in <br />accordance with INDOT criteria and played a key role in all <br />on -going construction engineering decisions. Construction <br />documentation was completed using INDOT's SiteManager <br />software. <br />Diamond Avenue Reconstruction Project <br />South Bend, Indiana <br />The Diamond Avenue Reconstruction project consisted of <br />a full reconstruction of Diamond Avenue pavement, storm <br />drainage, construction of a roundabout, and installation of a <br />pedestrian / bike path near the Notre Dame Campus. LFA <br />was intricately involved in coordination of the Maintenance <br />of Traffic for Notre Dame football weekends. LFA also <br />managed and responded to public comments and responses <br />during construction. <br />N <br />South Main Street to South Lafayette Boulevard <br />Connector - City of South Bend, Indiana <br />LFA studied the Erskine Development Area to determine a <br />Preferred Alternative providing a connecting link between South <br />Main Street to Ireland Road. The project involved traffic volume <br />projections, signalized intersection engineering analysis, and co- <br />ordination of redevelopment scenarios. The plans included arte- <br />rial and collector streets, Right -of -Way design, utility design and <br />coordination, street lighting, and four signalized intersections. <br />Major design elements included interconnected storm sewers <br />with detention and retention basins, balanced with horizontal <br />and vertical constraints. This project entailed different types of <br />property acquisition on 40 separate parcels, ranging, in owner- <br />ship and use from private residential to commercial/retail to in- <br />dustrial to City -owned. <br />LFAVATA City of South Bend, Indiana - Construction Inspection for Bendix Drive - Lathrop Street to I-80 Bridges - Des. No. 1400634 <br />LAW1,M41MMER ASSOMme Px <br />
The URL can be used to link to this page
Your browser does not support the video tag.