My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Three Twenty at the Cascade Site Utilities Project No 118-074D - Indiana Earth Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Three Twenty at the Cascade Site Utilities Project No 118-074D - Indiana Earth Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:25:00 PM
Creation date
12/12/2018 1:14:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Three Twenty at the Cascade — Site Utilities <br />Project Number: 118-074 D <br />For Bids Due: December 11, 2018 <br />Contractor Name: <br />DIVISION C — SITE STORM SEWER <br />Item <br />No. <br />Description <br />Quanti <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />24" perforated HDPE pipe w/ all <br />fittings installed <br />58 <br />LF <br />$ L f 7. oo <br />$ Q /-7alG. <br />2 <br />..._...... <br />12" SDR-26 PVC pipe w/ all <br />fittings installed complete ......_ <br />15 <br />.......... <br />LF <br />_. <br />$ /34),00 <br />$ / I gSaiC, <br />3 <br />12" HDPE-SL pipe w/ all fittings <br />installed complete <br />32 <br />LF <br />........ <br />$�� <br />...___ <br />$ C Cd.dD <br />4 <br />w/ all fittings installed <br />comp <br />10 <br />LF <br />$ %w0 <br />$ 700.00 <br />complete <br />5 <br />6" PVC pipe w/ all fittings installed <br />37 <br />LF <br />$ tj .Up <br />$ <br />complete <br />6 <br />Storm Water Structures per Plans: <br />a. Drywell DW-1 installed per <br />Schedule complete <br />1 <br />Ea. <br />q <br />$ o)J%0.00 <br />$ Ste. <br />b. Drywell DW-2 installed per <br />Schedule complete <br />_...... ......._. <br />1 <br />Ea. <br />$ a��, c <br />$ <br />c. Drywell DW-3 installed per <br />1 <br />_. <br />Ea. <br />$ <br />$ <br />Schedule complete <br />d. Drywell DW-4 installed per <br />Schedule complete <br />1 <br />Ea. <br />$ a, ?v�, <br />$ a, eel, <br />e. Drywell DW-5 installed per <br />Schedule complete <br />1 <br />Ea. <br />$ G� �, <br />$ 6� �O, <br />f. Drywell DW-6 installed per <br />Schedule complete <br />1 <br />Ea. <br />$ ,UCo, U0 <br />$ a J 030, co <br />g. Catch Basin CB-8 installed per <br />Schedule complete <br />1 <br />Ea. <br />$ oZ �� .03 <br />$ o� p� , Ob <br />h. Catch Basin CB-10 installed <br />Schedule <br />1 <br />Ea <br />$ a� �D®,� <br />$ <br />per complete <br />j. Manhole MH-8A installed per <br />1 <br />Ea. <br />$ a, r <br />$ <br />Schedule complete <br />14' wide French drain system w/ <br />7 <br />fabric and stone per details <br />1 <br />Ea. <br />$ 3(0 <br />$ 3�i <br />complete <br />,� <br />8 <br />Maintenance of Traffic for Site <br />Storm Sewer work <br />1 <br />Ea. <br />$ ,,ice, U3 <br />$ 10 <br />Sawcut and remove (20) SY+/- <br />9 <br />asphalt pavement for Storm <br />Sewer Catch Basin work at Gintz <br />20 <br />Tons <br />$ a 51. Elp <br />$ <br />Dr. <br />Version"7/20/2018 Contractor's Bid for Public Works - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.