Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND, <br />Project Name: Three Twenty at the Cascade — Site Utilities <br />_------ <br />--- <br />-..- <br />Project Number: 118-074 D` <br />For Bids Due: December 11, 2018 -, <br />Contractor Name: HRP CONSTRUCTION INC. <br />DIVISION A — SITE WATER SERVICE <br />Item <br />........ ...._ _.... <br />..�......�. <br />NO .w <br />_ N scri tin �„ <br />_Quantit ry <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />6" CL 50 DIP installed w/ all <br />fittings and valves complete <br />...... _ <br />265 <br />LF <br />$ <br />1 R 5.Ov <br />$ <br />149, poZS.Do <br />2 <br />4" CL 51 DIP installed w/ all <br />fittings and valves complete <br />15' <br />LF <br />$ <br />Hc9,Do <br />$ <br />0�,535.OD <br />Fire hydrant assembly w/ valve, <br />_... _ <br />_ ......�. <br />3 <br />lead, box and all fittings installed <br />1 <br />Ea. <br />$ <br />�, <br />$ <br />con"p lete <br />560. o 0 <br />1" corporation stop and 5 LF 1" <br />4 <br />Type K copper tube and all fittings <br />2 <br />Ea. <br />$ <br />$ <br />.. <br />complete <br />7SD. DD <br />2" corporation stop and 8 LF 2"..- <br />... <br />................ <br />5 <br />Type K copper tube and all fittings <br />1 <br />Ea. <br />$ <br />$ <br />com late <br />I, Soo. oo <br />I, Sao, cw <br />6 <br />Tap Fees <br />1 <br />Ea. <br />$ <br />a,yoo•00 <br />$ <br />A,c4vo-oo <br />..... _ ......_ <br />Licensed Plumber test all fittings, <br />�... <br />7 <br />piping and valves per details and <br />r, uirements <br />1 <br />Ea. <br />$ <br />3,Sd0 • o o <br />$ <br />8, Soo. 00 <br />8 <br />Maintenance of Traffic for Site <br />- <br />._ _ <br />Water Service work <br />........ <br />1 <br />Ea <br />$ <br />Q, 83C-) <br />$ <br />21, 830, o o <br />......... <br />Item 61 on Plan C303: sawcut <br />9 <br />and remove (13) SY+/- of 6" <br />concrete naavement <br />4.5 <br />Tons <br />$ <br />C100. o o <br />$ <br />10 <br />Item B2 on Plan C303: <br />------ <br />...... <br />.... _. ..�....... <br />a. Sawcut and remove (30) SY+/- <br />of 6" concrete approach <br />�... <br />10 <br />Tons <br />$ <br />o?oa . 00 <br />$ <br />a, DOD. 00 <br />. ...... <br />b. Replace (30) SY+/- of 6" <br />concrete approach <br />5 <br />CY <br />$ <br />(goo. Do <br />$ <br />3 Dao. 0 0 <br />c. Sawcut, remove and replace <br />(10) SY+/- of 4" concrete sidewalk <br />90 <br />SF <br />$ <br />1 oD • o v <br />$ <br />Q, Doo. o0 <br />d. Sawcut, remove and replace <br />. <br />- <br />(30) LF of 24" wide concrete curb <br />30 <br />LF <br />$ <br />Imo?. o o <br />$ <br />3, [oi�D• o� <br />utter at C <br />Colfax Ave. <br />e. Remove and replace brick <br />pavers with aggregate base to <br />match existing, <br />20 <br />SF <br />$ <br />lzD. oD <br />$ <br />3,0o0, 00 <br />11 <br />Item C on Plan C303.- <br />a. Sawcut and remove (16) SY+/- <br />asphalt pavement at Colfax Ave. <br />8 <br />Tons <br />$ <br />a po . o D <br />$ <br />1, b o • o 0 <br />Version 7/20/2018 Contractor's Bid for Public Works - 7 <br />