Laserfiche WebLink
DIVISION B, OLIVIA CIRCLE <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />$1,781.73 <br />$1,781.73 <br />2 <br />Maintenance of Traffic <br />1 <br />LS <br />$760.00 <br />$760.00 <br />3 <br />Mobilization and Demobilization <br />1 <br />LS <br />$6,800.00 <br />$6,800.00, <br />3 <br />Clearing and Grubbing <br />1 <br />LS <br />$24,800.00 <br />$24,800.00, <br />5 <br />Excavation, Common <br />755 <br />CYS <br />$47.85 <br />$36,126.75 <br />6 <br />7 <br />HMA, Surface, 1 1/2" <br />HMA, Intermediate, 2 1/2" <br />2 <br />2 <br />T <br />T <br />$415.00 <br />$385.00 <br />$830.00 <br />$770.00 <br />8 <br />�HMA, Base, 4" <br />3 <br />T <br />$270.00 <br />$810.00 <br />9 <br />Flowable Fill <br />3 <br />CYS <br />$393.00 <br />$1,179.00 <br />10 <br />Std Inlet, Storm, Rolled Curb <br />2 <br />EA <br />$2,900.00 <br />$5,800.00 <br />11 <br />Remove/Replace Curb and Gutter, Roll <br />Curb <br />10 <br />LFT <br />$195.00 <br />$1,950.0 <br />12 <br />Pipe, 12" RCP <br />26 <br />LFT <br />$144.00 <br />$3,744.00 <br />13 <br />Pipe, Ductile Iron, 12" Dia, <br />23 <br />LFT <br />$190.00 <br />$4,370.00 <br />14 <br />15 <br />Pipe End Section, 12" Dia., <br />Topsoil, 4 K <br />1 <br />151 <br />EA <br />CYS <br />$960.00 <br />$68.00 <br />$960.00 <br />$10,268.00 <br />16 <br />Seed Mixture Grass, Type 2 <br />1356 <br />SYS <br />$1.92 <br />$2,603.52 <br />17 <br />Erosion Control <br />1 <br />LS <br />$1,050.00 <br />$1,050.00 <br />18 <br />Core, Concrete Structure, 8 IN. Dia. <br />1 <br />EA <br />$1,500.00 <br />$1,500.00 <br />19 <br />Reset River Rock <br />1 <br />LS <br />$6,900.00 <br />$6,900.00 <br />20 <br />Riprap, Revetment <br />13 <br />T <br />$325.00 <br />$4,225.00 <br />21 <br />Geotextile for River Rock, Riprap <br />61 <br />SY <br />$47.00 <br />$2,867.00 <br />22 <br />Casting, Adjust to Grade <br />1 <br />EA <br />$1,905.00 <br />$1,905.00 <br />23 <br />Utility Allowance <br />I <br />LS <br />$18,000.00 <br />$18,000.00 <br />OLIVIA CIRCLE DIVISION B TOTAL $140,000.00 <br />