BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Small Drainage Design and Repair
<br />Project Number: 118-063
<br />For Bids Due: December 11, 2018 before 9:30 AM Local Time
<br />ContractorName: G.E. Marshall, Inc.
<br />DIVISION B, OLIVIA CIRCLE
<br />...... item
<br />No.
<br />Description
<br />. . .........................
<br />Quantity
<br />Unit
<br />Unit Price
<br />.
<br />Total Amount
<br />. ........ . .......
<br />I
<br />Construction Engineering
<br />1
<br />LS
<br />$4,240.00
<br />$4,240.00
<br />...
<br />2
<br />.1 . . ........................... . ..... ___ . .........
<br />Maintenance of Traffic
<br />1
<br />. ........
<br />. .........
<br />LS
<br />. .........
<br />$1,000-00
<br />$1,000.00
<br />3
<br />.
<br />Mobilization and Demobilization
<br />. ... .. ....
<br />. . .
<br />1
<br />LS
<br />2 051.52
<br />$12,351.52
<br />3
<br />Clearing and Grubbing
<br />1
<br />LS
<br />$16,150.00
<br />$16,150.00
<br />5
<br />Excavation, Common
<br />. . . .......... . .....
<br />755
<br />CYS
<br />. ...............
<br />1,a6,A10_.a0 . .......
<br />6
<br />HMA Surface, 1 W ...........
<br />2
<br />T
<br />$420.00
<br />....... . ....
<br />$840.00
<br />..... -
<br />7
<br />HMA, Intermediate, 2 W
<br />2
<br />T
<br />$360.00
<br />$720.00
<br />8
<br />HMA, Base, 4
<br />3
<br />.......... T
<br />$360.00
<br />$1,080.00
<br />9
<br />Flowable Fill
<br />3
<br />CYS
<br />$123.90
<br />$371.70
<br />10
<br />Std Inlet Storm, Rolled Curb
<br />ZL-=
<br />2
<br />EA
<br />$2,106.21
<br />$4,212.42
<br />44
<br />- - — ----
<br />4
<br />P'IiAl
<br />11
<br />Remove/Replace Curb and G ut t e r,
<br />10
<br />LFT
<br />$241.57
<br />$2,415-70
<br />Roll Curb
<br />12
<br />Pipe. 12" RCP
<br />26
<br />LFT
<br />$61.60
<br />$1,601.60
<br />13
<br />Pipe, Ductile Iron, 12" Dia,
<br />23
<br />LFT
<br />$147.05
<br />$3,382.15
<br />_14
<br />Pipe End S ficLn, 12",,Dia,,
<br />I
<br />EA
<br />$224.75
<br />$224.75
<br />15
<br />To .....................
<br />151
<br />CYS
<br />$67.94
<br />— — --------
<br />$10,258.94
<br />16
<br />NlWched &.,�ednu j a,.,,,,
<br />. _L r, 2
<br />361356
<br />�SYSLBS
<br />$8.72
<br />$11,824 .32
<br />......... . .
<br />17
<br />Erosion Control
<br />1
<br />LS
<br />$3,000.00
<br />$3,000.00
<br />18
<br />-Core, Concrete Structure 8 IN. Dia,
<br />=� .... . .
<br />1
<br />....... .... . ...... . ............. .
<br />EA
<br />. . . . ..
<br />$420.00
<br />............. . ..........................
<br />$420.00
<br />. . . .....
<br />19
<br />Reset River Rock
<br />1
<br />LS
<br />___$1,508.00
<br />_�L508. 00
<br />20 .,_,,Ri
<br />a ,.Revetment
<br />..... ...............
<br />13
<br />T
<br />$96.13
<br />$1,249.69
<br />21
<br />Geotextile for River Rock, Riprap
<br />61
<br />SY
<br />$8,31
<br />15 9
<br />22
<br />Castini, Grade
<br />just to .. . ....... . .........
<br />1
<br />l:::A
<br />$300.00
<br />. .. . ..............
<br />$300.00
<br />23
<br />LJ��nce
<br />1
<br />LS
<br />$18,000.00
<br />$18,000.00
<br />OLIVIA CIRCLE DIVISION B TOTAL $122,128. 00
<br />Version 7/20/2018 Contractor's Bid for Public Works - 9