Laserfiche WebLink
BID/PROPOSAL <br />CITY <br />OF SOUTH BEND <br />Project Name: Small Drainage <br />Design and Repair <br />Project Number: 118-063 <br />For Bids Due: December 11, 2018 before 9:30 AM Local Time <br />. . . . ............ . . ....... . . .. . . . . ........... <br />Contractor Name: <br />DIVISION A, HAWBAKER <br />Item Description <br />No. <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />$4,720.00 <br />$4,720.00 <br />. .............. <br />2 <br />Maintenance of Traffic <br />1 <br />LS <br />- -0-0. <br />—TrID - <br />1yo — <br />3 <br />1 <br />Mobilization and Demobilization <br />1 <br />. ......... ..... <br />. ........................... <br />LS <br />. <br />........... ............ <br />$12,455.96 <br />. ... 1 <br />$12,455.96 <br />4 <br />Clearing and Grubbing <br />1 <br />LS <br />$3,636.00 <br />$3,636.00 <br />5 <br />Excavation, Common <br />—_i <br />590 <br />CyS <br />. ........... . . . . . . <br />$23-63 <br />$13,941.70 <br />6 <br />Fence, Chain -Link, Reset <br />. ................ . . . ............... <br />223 <br />.... . . <br />LFT <br />- - - - — - - - ­­­­ - - -- <br />$12'. 25 <br />. ......... <br />$2,731.75 <br />7 <br />Std. Inlet, Beehive Grate <br />1 <br />EA <br />$2,581.16 <br />$2,581.16 <br />8 <br />Std. Manhole, Shallow, Bee ive <br />I <br />. ............... <br />EA <br />Grate <br />$3,085.39 <br />$3,085.39 <br />1 9 <br />Pipe, 12", RCP <br />117 <br />LFT <br />$72.07 <br />$8,432.19 <br />10 <br />Pipe, 15", RCP <br />7-030 <br />LFT <br />167 <br />1,1 <br />Pipe, 121", DucNe Iron <br />............... <br />—ecti <br />40 <br />L.J.- "1"' <br />$264.62 <br />$10,584.80 <br />12 <br />Pipe End S, o n 1' 2" Dia. <br />8 <br />EA <br />$224.75 <br />$1.9798 00 <br />13 <br />Core Connection, for, 9#6lGtUre, <br />15" Dia, Pi�l)e <br />1 <br />EA <br />$1,006.00 <br />$1,006.00 <br />14 <br />­­ . .................... <br />Remove/Replace Concrete <br />Appro, ach . . <br />. ... 7 . . <br />199 <br />. . ............. <br />. . . ...... .. .. .. .... <br />SYS <br />$134-55 <br />$26,775.45 <br />'15 <br />Ma0box AssernNy, Reset <br />I <br />�EA <br />$300.00 <br />$300.00 <br />16 <br />Sodding <br />. ...... . ...... . .... . <br />1576 <br />SYS <br />$9.75 <br />$15,366.00 <br />'17 <br />Erosion Control <br />1 <br />LS <br />1$3,000.00 <br />$3,000.00 <br />18 <br />Utility Allowance <br />1 <br />LS <br />$21,000.00 <br />$21,000.00 <br />HAWBAKER DIVISION A TOTAL$135,628.00 <br />ALTERNATE <br />#A1 (STREET PAVEMENT REMOVAL/REPLACEMENT) <br />tern <br />No. <br />Description <br />­_­­ ­­.­­ ................ ... . . . ........... <br />Quantity <br />Unit Unit Price <br />........... <br />Total Amount <br />'19 <br />. ........... <br />Pavement Removal <br />I <br />. ...... — <br />. ..... _ <br />LS $26,944.60 <br />__ <br />— ------ <br />9 A �. 6 0 <br />20 <br />HMA Surface, 1 %" <br />175 <br />T $109.86 <br />$19,225.50 <br />21 <br />HMA, Intermediate, 2 Y2" <br />292 <br />T $97.32 <br />$28,417.44 <br />22 <br />.. . .. ............ <br />HMA, Base, 4" <br />466 <br />T $85.45 <br />$39,819.70 <br />. .... ...... <br />Compacted A(Lq., #53, Base <br />..... <br />353 <br />CYS $91-98 <br />$32,468.94 <br />.......... <br />__Z!___JLRipe, <br />12", RCP <br />36-r <br />LFT $67.15 <br />$2,417.40 <br />Version 7/20/2018 Contractor's Bid for Public Works - 7 <br />