My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Insituform Technologies USA LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Insituform Technologies USA LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 4:00:16 PM
Creation date
12/12/2018 1:04:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Figure i <br />Figure 2 <br />PUTTING CLAIMS TO THE TEST <br />The installation of all products used in the test was <br />performed by the manufacturers on the Louisiana <br />Tech University campus under close monitoring by <br />TTC personnel. Forty specimens each of Insituform <br />Standard and Insituform <br />Enhanced were tested. <br />Each test specimen was <br />installed to fit snugly inside <br />a 1.83 m (6 ft.) long, 305 mm <br />(12 in.) internal diameter, <br />schedule 40 steel casing <br />pipe. Each casing pipe was <br />fitted with short, bolted <br />pipe segments (clamshells) <br />at each end. (See Figure 1). <br />Preparing the specimens for testing involved trim- <br />ming the ends flush with the clamshells, removing <br />the clamshells, and cleaning the ends of the speci- <br />mens. This resulted in the plastic <br />pipe extending beyond the ends <br />of the steel casing pipes. The <br />specimens were then fitted with <br />end seals applied externally, span- <br />ning the casing pipe and plastic <br />pipe. (See Figure 2). The end <br />seals contained the water at the <br />prescribed pressure, which was <br />Table 1 <br />Material Characterization Tests (Short-term) <br />supplied between the plastic and casing pipes from <br />a pressurized water distribution system. <br />At least three specimens of each product were <br />used for short-term buckling tests to determine <br />the upper pressure limit for the long-term tests. <br />A regulator was used to raise the pressure on <br />the specimen, and the rate of load application <br />was kept constant until failure occurred. <br />For the long-term tests, each specimen was <br />pressurized at a controlled rate of 10 psi/minute <br />(69 kPa/minute) until a selected pressure was <br />reached. A minimum of five pressure levels were <br />selected for each product to cause the specimens to <br />fail at various times over a 10,000-hour test period. <br />Specimens were monitored at least once a day <br />for evidence of buckling. Failures that occurred <br />during normal work hours were monitored <br />manually. After normal work hours, failures <br />were detected electronically. <br />V064 1?r1 cPed_Z r _T <br />Numerous tests, including flexural modulus, flexural <br />strength and tensile strength, were conducted on <br />each product according to ASTM standards. On each <br />of these tests, the results found that both Insituform <br />products far surpassed the design values. <br />(See Table f). <br />jFiY'iCi " <br />�'iNSi'rrtieP <br />ASTM " ": <br />fi�ANUFACTdREA`5. <br />TrC TEST <br />PriUr°ETY : '"' <br />i'ti0bi}CT <br />"TEST <br />DESIGN YAtUE, <br />rtESULTS <br />TNGG <br />psi (MPa) <br />psi ma) <br />Flexural Modulus <br />Stan dard <br />D790- <br />_..W448,63 <br />gigl�lp-_ <br />( ) <br />(3090) <br />Enhanced <br />. D790 <br />100,000 , � <br />538,620 <br />(2760�) .. <br />(3710) . <br />Flexural Strength <br />Standard <br />D790 <br />4,500 <br />9,310 <br />(31) <br />(64) <br />Enhanced <br />D790 <br />A )09 <br />(58) <br />
The URL can be used to link to this page
Your browser does not support the video tag.