My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Insituform Technologies USA LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Insituform Technologies USA LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 4:00:16 PM
Creation date
12/12/2018 1:04:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
February 2018 <br />Insituform Technologies <br />RE: Documentation — OSHA Citations Explanation <br />November 2015 #1107489.015 — Greely, Colorado <br />• Jobsite — Subcontractor <br />s Other Than Serious <br />• Citation Amount $6,800.00 <br />Conditions that caused the hazards <br />m Crew could not provide safety training records of hazards recognition and unsafe <br />conditions training <br />• Confined Space corral did not have both chains connected to prevent <br />unauthorized entry into the confined space <br />Corrective Actions Taken <br />• Provided OSHA with supporting documentation of the employees hazard <br />recognition and unsafe conditions training record <br />• Retrained the employees on confined space entry and confined space equipment <br />January 2016 #1119106.015 — Washington Township, Michigan <br />• MIOSHA <br />• Other Than Serious <br />o No Monetary Citation Issued <br />Conditions that caused the hazards <br />• Failure to have Accident Prevention Program Onsite <br />• Failure to have the appropriate sized fire extinguisher for vehicle external fuel <br />tank <br />• Had the incorrect dispensing nozzle device for flammable liquids (class 1,2, &3) <br />Corrective Actions Taken <br />• Retrained the employees on accident prevention and provided the Crew with <br />updated Accident Prevention Program (Has to be onsite at all times) <br />• Retrained the employees on fire extinguishers and provided the Crew with the <br />appropriate size fire extinguisher for external fuel tanks. <br />• Purchased the correct type of nozzle for flammable liquids (class 1, 2, & 3) and <br />sent out a Safety Alert to inform the entire business of this issue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.