Laserfiche WebLink
Plans and specifications Avala4le from 0_ ne En in r <br />Rrlitr m.�liga� qu,u0a utrwlu_', 1g11 r if"rzr Rtfm <br />• Project Completion date: September 1, 2019 <br />• Liquidated Damages: Per Day $ 1,500.00 <br />MBE/WBE participation is requested for this project. If you are an MBE/WBE, please submit evidence of your certification along <br />with an executed copy of the EPA form 6100-3 <br />• Only one mobilization will be paid <br />• For all quotes, unless otherwise specified, your proposal unit prices should include: Mobilization, acquisition of water meters, water usage <br />fees, bypass pumping as necessary, traffic control, permits, restoration of grounds and structures disturbed by your work, performance bond, <br />maintenace bond per specifications for your work, general and sppecial insurance required per the specifications and cost of getting plans. For <br />sewer cleaning quotes, please note conditions on Conditions Tab. <br />• Local prevailing wage rates apply. <br />• Payment terms per specification <br />Quotations received will be evaluated with importance placed in the following sequence: 1-Qualification; 2-Past Performance; 3-Financial <br />Background; 4-Price. We are an EOE. <br />• Any information from the Specifications or Plans that we send to you regarding this project is as a courtesy only. You will still be responsible <br />for evaluating all work that you quote based on the full plans,speeliications and addenda as issued by: <br />E D i Cer <br />Please fax your quote by 9 AM of the above referenced due date to (314) 291-0668, Attn: Mark Warner. Email responses may be sent to <br />mwamer@aegion.com <br />Thank You. <br />INSITUFORM TECHNOLOGIES USA, INC. <br />Mark Warner, Estimator <br />BY: <br />Signed: <br />Date: <br />