My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Insituform Technologies USA LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Insituform Technologies USA LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 4:00:16 PM
Creation date
12/12/2018 1:04:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
lnwtuform Worldwide Pipeline Rehabilitation 2130 Stout Field West Drive <br />Tel: (317) 489-3863 Indianapolis, IN 46241 <br />Fax: (317) 489-3872 www.insituform.com <br />Good Faith Efforts to Meet MBE/WBE Goals <br />MBE/WBE LIST(S) <br />Lists utilized to identify possible sub -contractors include the City of South <br />Bend and the IDOA websites. <br />ACTION (ADVERTISE/CONTACT) <br />1. We were in attendance at the first advertised pre -bid meeting. <br />2. Based on more than 15 years of experience working in North Central <br />Indiana, we've found advertising to provide no additional quotes from <br />M/WBE Vendors. We are constantly identifying and increasing our sub list <br />to gain as much involvement from qualified M/WBE firms. The limited <br />number of contractors able to provide services required for this specialized <br />work also reduces the need to advertise, as we maintain regular <br />communication with all M/WBE firms who are able to work with us. <br />3. MBE/WBE Firms were contacted via email as shown on our included <br />spreadsheet. Plans and Specifications were made available for review on <br />our online planroom and all subcontractors contacted received a link to <br />this site. ITUSA works regularly with M/WBE firms and they were <br />contacted to increase interest in this project. <br />GOOD FAITH NEGOTIATIONS <br />We select our sub -contractors based solely on the price of their quote. As <br />we are expected to provide the lowest bid to win a project, we require the <br />same from our sub -contractors. <br />SMALL CONTRACTS <br />We broke the work up into the standard divisions utilized on all CIPP <br />projects. The scope of the work reduces the opportunity for MBE/WBE <br />utilization as we are able to self perform work for less cost than most sub- <br />contractors. <br />CONTRACT RECORDS <br />1. All MBE/WBE information requested in this section has been provided on <br />the included spreadsheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.