My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Inland Waters Pollution Control Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Inland Waters Pollution Control Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:57:42 PM
Creation date
12/12/2018 1:02:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(tiPC <br />AN IPR COMPANY <br />THE SCIENCE OF UNDERGROUND SOLUTIONS <br />Collection System Rehabilitation CIPP Lining <br />Owner: Sanitary District 1 <br />1045 Eaton Dr. <br />Start <br />013 <br />Contractor <br />CIPP lining 6" (500'), 8" (31,000'), 10" (1,450'), 12" <br />Ft. Wright, KY 41017 $ 2,392,042.50 <br />(2,500'), 15" (1,250'), 18" (5,000'), 21" (1,250'), <br />Kyle Boyle, P.E. <br />n <br />Completion <br />24" (30'), and 36" (655') diameter sanitary sewer. <br />.....�.— �......._.. <br />859-547-1644 <br />7/12/2013 <br />Owner: Independence Hi.......�....... ...-...... <br />Hill <br />�...m. ,_. <br />Conservancy District <br />22012 Trenchless Reconstruction of Sanitary sewers <br />7507 Taft Street <br />Phase 4 <br />Merrillville, IN 46410 <br />Start <br />CIPP lining project involving 8" (17,101') and 12" <br />Engineer: North-West $566,565.00 <br />7/22/2012 <br />(4,780') diameter sanitary sewer <br />Engineering Co Inc <br />Completion <br />Gary, IN 46402 <br />4/28/2013 <br />Aravind Muzumdar <br />219-0769-3996 <br />Owner: Borough of Middleburg <br />13 North Main Street <br />SanitaryMiddleburg, <br />Sewer Rehabilitation Project <br />PA <br />Start <br />CIPP lining of approximately 8,900 linear feet of 8" <br />Engineer: Larson Design Group <br />9/30/2012 <br />diameter pipe. Rehabilitation and lining of 8 <br />1000 Commerce Park Drive $827,135.00 <br />Completion <br />manholes in addition to 6 spot repairs <br />Suite 201 <br />11/11/2012 <br />Williamsport, PA 17701 <br />Attn: Chris Beidler P.E. <br />570-323-6603 <br />Owner: City of Royal Oak <br />2012 Sewer Lining- Contract lido, S-1201 <br />211 Williams Street <br />0tart <br />06/01/2012 <br />CIPP lining of approximately 10,000 linear feet 8"- <br />Royal Oak, MI 48068 $297,237.50 <br />18"in diameter <br />William P. Heil, P.E. <br />Completed <br />01/31/2013 <br />248-246-3260 <br />Owner: Cityof Dayton o <br />Wagner Ford Sanitary Li <br />Liner Installation Phase 2 <br />320 W. Monument Dr. <br />Start <br />6/17/2012 <br />CIPP lining of 10,129 linear feet of 42" diameter <br />Dayton, OH 45402 $3,197,794.00 <br />Donald Kinnison <br />Completion <br />9/9/2012 <br />937-333-3739 <br />-�������� <br />City of Novi <br />Sanitar Sewer Rehabilitation Areas B C1 & G <br />45175 W. Ten Mile Road <br />Novi Michigan 48375 <br />g $596,490.75 <br />Start <br />012 <br />CIPP liningof 17 460 linear feet 6" —15" in <br />diameter <br />Maria Sedki, P.E. <br />Completion <br />Completion <br />11/25/2012 <br />248-844-5400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.