My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Inland Waters Pollution Control Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Inland Waters Pollution Control Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:57:42 PM
Creation date
12/12/2018 1:02:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THE SCIENCE OF R•UND SOLUTIONS <br />PROJECT REFERENCES <br />CURED -IN -PLACE PIPE f <br />sections include replacement of 1741f of 21" and <br />1200 Kentucky Ave. <br />3/24/2013 <br />1581f of 27" diameter pipe <br />Frankfort, KY 40601 <br />(502) 875-2448 <br />Engineer: <br />Hazen & Sawyer <br />Amanda Mikuski <br />444 Lewis Hargett Circle#260 <br />Lexington, KY 40503 <br />(859)219-1126 <br />Royal Oak Michi an <br />Owner/Engineer: <br />2012 Sewer Lining <br />City of Royal Oak <br />CIPP lining of 8" (5,450'), 10" (1,500'), 12" (1,600% <br />Merleo Seneras <br />Start <br />15" 950' and 18" 500' . <br />211 Williams <br />11/1/2012 <br />P.O. Box 64 <br />Completion <br />1/4/2013 <br />Royal Oak, MI 48068 <br />(248) 246-3266 <br />Owner: City of Farmington <br />33720 West Nine Mile Rd <br />Farmington, MI 48335 <br />Floral Park Swgbdivision Sewer Rehabilitation <br />Engineer: Orchard, Hiltz & <br />Start <br />CIPP liningof 16 000 linear feet of 8" . 15" <br />McCliment Inc. <br />$566,500.00 <br />/20/12 <br />3mplet <br />diameter pipe <br />3400 Plymouth Rd <br />Completed <br />Livonia, MI 48150 <br />10/30/12 <br />Matthew Parks, P.E. <br />734-552-6711 <br />(North Huron Valley/Rouge Valley — Short Terra <br />Owner: Charter County of <br />Corrective Action Plan <br />Wayne, Michigan <br />Rehabilitation of 1,013 manholes, sewer lining of <br />Engineer: Hubbell, Roth & Clark, <br />10,113 linear feet of sanitary interceptors, 17 spot <br />Inc. <br />Start <br />repairs and 167 joint repairs of the interceptors, <br />200 Bagley, Suite 420 <br />$17,167,477.89 <br />02/10/10 <br />cleaning of six siphons (1,616 linear feet, ranging in <br />Detroit, MI 48226 <br />Completion <br />size from 8" to 42" in diameter). CIPP lining of 48" <br />Attn: William Davis, P.E. <br />6/1/2012 <br />(643') 60" (2834') 66" (806') and 78" (2,582' Over <br />313-965-3330 <br />the Hole Wet Out) and slip lining of 72" (1,695') <br />and 90" (582') diameter interceptor <br />Tri-State Pipeline — St, Ma 's WV — Phase II <br />Owner: City of St. Marys <br />Re l'acement Pro'ect <br />418 2"d Street <br />Start <br />„ <br />Subcontracted CIPP lining of 6 (600 ), 8 (3,300 ), <br />St. Marys, WV 26170 <br />$510,100.00 <br />4/1/2012 <br />10" (1,700% and 18" (2,000') diameter pipe. <br />Prime: Tri State Pipeline <br />Com�let_ion <br />5/1/2012 <br />Lateral replacement and top hats <br />Eric Taylor <br />304-733-6801 <br />#3399-Trenchless Sewer Lining <br />Owner: City of Midland <br />Start <br />CIPP lining of 8" (540') 10" (1,223') 21" (375') and <br />333 W. Ellsworth St. <br />$231,960.00 <br />2/20/2012 <br />24" 1 878') diameter <br />( r pipe <br />Midland... .m..� Mi 48640 <br />............ � ... ...... <br />Comn <br />pletio <br />__-m-.._.-... <br />4086 Michigan Ave. Detroit, MI 48206 <br />
The URL can be used to link to this page
Your browser does not support the video tag.