My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Inland Waters Pollution Control Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Inland Waters Pollution Control Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:57:42 PM
Creation date
12/12/2018 1:02:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THE SCIENCE OF UNDERGROUND SOLUTIONS <br />REFERENCESPROJECT <br />CURED -IN -PLACE <br />PIPE <br />w .�. .... �� ..m_. <br />Reading, PA 19605 <br />2 24/2013 <br />Engineer: Great Valley <br />Consultants <br />Nick Johnson <br />............ ._... <br />610-375-8822 <br />............. <br />mA.. ................ <br />Owner: Western Virginia Water <br />6 ._._...... <br />. .-. , <br />Authority <br />2011 Sewage Collection S stem Im rovements <br />601 S. Jefferson St <br />Start <br />CIPP lining of 5,200 linear feet of 8" diameter pipe <br />3d Floor Suite 300 <br />$579,376.40 <br />9/1/2012 <br />and pipe bursting of 75 laterals <br />Roanoke, VA 24011 <br />Coffin. <br />8/15/2013 <br />Earl Smith, P.E. <br />540-853-5700 <br />2013 SS Rehab Pro'ect - Phase I <br />..................................... <br />Township pp Macungie, PA <br />Joint sanitary sewer rehabilitation project under <br />8330 Schantz Rod <br />Start <br />four munici <br />municipalities for the CIPP lining of <br />p g <br />Breinigsville, PA 10831 <br />$207,977.55 <br />4/15/2013 <br />approximately 8,059 linear feet of 8" and 530 <br />Engineer: Keystone Engineers <br />Completion <br />9/30/2013 <br />linear feet of 10" sanitary sewer <br />Tim Miller <br />610-395-0971 <br />Owner: Allegheny County <br />[#1477-Interceptor <br />Sanitary Authority <br />Lining & Cleaning <br />3300 Preble Ave. <br />Start <br />CIPP liningof 10' 219' 15" 791' 18" 334' and <br />Pittsburgh, PA 15233 <br />00 <br />5/ 13 2012 <br />30" (5,220') diameter pipe <br />412-732-1232 <br />Coition <br />10/21/2012 <br />Engineer: AMEC E&C Services <br />Jim McCarthy, P.E. <br />724-940-4200 <br />,City of Uniontown, PA <br />20 North Gallatin Ave <br />Redstone Interceptor Upgrade -Uniontown PA <br />Uniontown, PA 15401 <br />CIPP lining of 5,500 linear feet of 21"-30" sanitary <br />724-430-2910 <br />1,796,165.00 <br />Completed <br />Engineer: <br />sewer <br />K2 Engineering, Inc. <br />Aaron Wigfield, PE <br />724-439-3440 <br />West Homestead <br />2012 Sewer Repair Pro"ect <br />456 West Eighth Ave <br />CIPP lining of 9,985 If of 8" and 600 If of 12" <br />West Homestead PA 15120 <br />sanitary sewer. 99 CIPP point repairs and grouting <br />412-461-1844 <br />1,610,740.00 <br />Completed <br />of laterals. <br />Engineer: Seig and Associates, Inc <br />Karl P. Seig, P.E. <br />724-935-2040 <br />Sty°,'MTV - Phase IImRe lac... <br />Replacement Project <br />'Tri <br />State Pipeline <br />418 2nd Street <br />$510,000.00 <br />Completed <br />CIPP lining of 6" (600') 8" (3,300') 10" (1,700') and <br />18" (2,000') diameter pipe <br />St. Marys, WV 26170 <br />4086 Michigan Ave. Detroit, MI 48206 <br />
The URL can be used to link to this page
Your browser does not support the video tag.