DIVISION B — FREMONT PARK IMPROVEMENTS (MARQUETT STREET AND FREMONT TO STA. 24+5+0)
<br />Item No.
<br />1
<br />Description
<br />Maintaining Traffic
<br />Quanti
<br />1
<br />Unit
<br />LS
<br />Unit Price
<br />$5,300.00
<br />Total Amount
<br />$5,300.00
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$8,300.00
<br />$8,300.00
<br />3
<br />Clearing of Right of Way
<br />1
<br />LS
<br />$7,621.00
<br />$7,621.00
<br />4
<br />Excavation, Common
<br />80
<br />CYS
<br />$111.30
<br />$8,904.00
<br />5
<br />Surface Milling, Asphalt, 1 1/2 IN
<br />240
<br />SYS
<br />$17.25
<br />$4,140.00
<br />6
<br />Temporary Erosion Control
<br />1
<br />LS
<br />$2,100.00
<br />$2,100.00
<br />7
<br />Temporary Inlet Protection
<br />9
<br />EA
<br />$115.00
<br />$1,035.00
<br />8
<br />Catch Basin
<br />2
<br />EA
<br />$4,715.00
<br />$9,430.00
<br />9
<br />Drywell, 8' Diameter, 3600 gal
<br />3
<br />EA
<br />$8,900.00
<br />$26,700.00
<br />10
<br />Storm Sewer Pipe, 8 IN
<br />0
<br />LFT
<br />$0.00
<br />$0.00
<br />11
<br />Storm Sewer Pipe, Perforated, 12 IN
<br />10
<br />LFT
<br />$190.00
<br />$1,900.00
<br />12
<br />13
<br />14
<br />15
<br />Compacted Aggregate, No. 53
<br />HMA Surface, Type B
<br />Standard Curb, Concrete
<br />Hydro -mulch Seeding, Mix
<br />0
<br />20
<br />700
<br />320
<br />TON
<br />TON
<br />LFT
<br />SYS
<br />$0.00
<br />$198.00
<br />$19.10
<br />$16.50
<br />$0.00
<br />$3,960.00
<br />$13,370.00
<br />$5,280.00
<br />16
<br />HMA Patching, Type B, Undistributed
<br />20
<br />TON
<br />$208.00
<br />$4,160.00
<br />DIVISION B - TOTAL $102,200.00
<br />ALTERNATE B1 — FREMONT PARK IMPROVEMENTS (STA.. 24+50 TO STA. 27+88)
<br />Item No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />2
<br />Maintaining Traffic
<br />Mobilization and Demobilization
<br />1
<br />1
<br />LS
<br />LS
<br />$4,040.00
<br />$3,129.00
<br />$4,040.00
<br />$3,129.00
<br />3
<br />Clearing of Right of Way
<br />1
<br />LS
<br />$6,900.00
<br />$6,900.00
<br />4
<br />Excavation, Common
<br />40
<br />CYS
<br />$111.30
<br />$4,452.00
<br />5
<br />Surface Milling, Asphalt, 1 1/2 IN
<br />120
<br />SYS
<br />$23.15
<br />$2,778.00
<br />6
<br />Sign, Relocate
<br />1
<br />EA
<br />$300.00
<br />$300.00
<br />7
<br />Temporary Erosion Control
<br />1
<br />LS
<br />$1,080.00
<br />$1,080.00
<br />8
<br />Temporary Inlet Protection
<br />7
<br />EA
<br />$115.00
<br />$805.00
<br />9
<br />Catch Basin
<br />1
<br />EA
<br />$4,715.00
<br />$4,715.00
<br />10
<br />Drywell, 8' Diameter,3600 gal
<br />2
<br />EA
<br />$8,900.00
<br />$17,800.00
<br />11
<br />Storm Sewer Pipe, 8 IN
<br />0
<br />LFT
<br />$0.00
<br />$0.00
<br />12
<br />Storm Sewer Pipe, Perforated, 12 IN
<br />10
<br />LFT
<br />$190.00
<br />$1,900.00
<br />13
<br />Compacted Aggregate, No. 53
<br />0
<br />TON
<br />$0.00
<br />$0.00
<br />14
<br />HMA Surface, Type B
<br />10
<br />TON
<br />$192.00
<br />$1,920.00
<br />15
<br />Standard Curb, Concrete
<br />360
<br />LFT
<br />$22.10
<br />$7,956.00
<br />16
<br />17
<br />Sign Post, Square Type 2, Unreinforced
<br />Anchor Base
<br />Hydro -mulch Seeding, Mix
<br />9
<br />160
<br />LFT
<br />SYS
<br />$35.00
<br />$20.00
<br />$315.00
<br />$3,200.00
<br />18
<br />HMA Patching, Type B, Undist
<br />10
<br />TON
<br />$251.00
<br />$2,510.00
<br />ALTERNATE 131 -TOTAL $63,800.00
<br />
|