Laserfiche WebLink
DIVISION B — FREMONT PARK IMPROVEMENTS (MARQUETT STREET AND FREMONT TO STA. 24+5+0) <br />Item No. <br />1 <br />Description <br />Maintaining Traffic <br />Quanti <br />1 <br />Unit <br />LS <br />Unit Price <br />$5,300.00 <br />Total Amount <br />$5,300.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />$8,300.00 <br />$8,300.00 <br />3 <br />Clearing of Right of Way <br />1 <br />LS <br />$7,621.00 <br />$7,621.00 <br />4 <br />Excavation, Common <br />80 <br />CYS <br />$111.30 <br />$8,904.00 <br />5 <br />Surface Milling, Asphalt, 1 1/2 IN <br />240 <br />SYS <br />$17.25 <br />$4,140.00 <br />6 <br />Temporary Erosion Control <br />1 <br />LS <br />$2,100.00 <br />$2,100.00 <br />7 <br />Temporary Inlet Protection <br />9 <br />EA <br />$115.00 <br />$1,035.00 <br />8 <br />Catch Basin <br />2 <br />EA <br />$4,715.00 <br />$9,430.00 <br />9 <br />Drywell, 8' Diameter, 3600 gal <br />3 <br />EA <br />$8,900.00 <br />$26,700.00 <br />10 <br />Storm Sewer Pipe, 8 IN <br />0 <br />LFT <br />$0.00 <br />$0.00 <br />11 <br />Storm Sewer Pipe, Perforated, 12 IN <br />10 <br />LFT <br />$190.00 <br />$1,900.00 <br />12 <br />13 <br />14 <br />15 <br />Compacted Aggregate, No. 53 <br />HMA Surface, Type B <br />Standard Curb, Concrete <br />Hydro -mulch Seeding, Mix <br />0 <br />20 <br />700 <br />320 <br />TON <br />TON <br />LFT <br />SYS <br />$0.00 <br />$198.00 <br />$19.10 <br />$16.50 <br />$0.00 <br />$3,960.00 <br />$13,370.00 <br />$5,280.00 <br />16 <br />HMA Patching, Type B, Undistributed <br />20 <br />TON <br />$208.00 <br />$4,160.00 <br />DIVISION B - TOTAL $102,200.00 <br />ALTERNATE B1 — FREMONT PARK IMPROVEMENTS (STA.. 24+50 TO STA. 27+88) <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />2 <br />Maintaining Traffic <br />Mobilization and Demobilization <br />1 <br />1 <br />LS <br />LS <br />$4,040.00 <br />$3,129.00 <br />$4,040.00 <br />$3,129.00 <br />3 <br />Clearing of Right of Way <br />1 <br />LS <br />$6,900.00 <br />$6,900.00 <br />4 <br />Excavation, Common <br />40 <br />CYS <br />$111.30 <br />$4,452.00 <br />5 <br />Surface Milling, Asphalt, 1 1/2 IN <br />120 <br />SYS <br />$23.15 <br />$2,778.00 <br />6 <br />Sign, Relocate <br />1 <br />EA <br />$300.00 <br />$300.00 <br />7 <br />Temporary Erosion Control <br />1 <br />LS <br />$1,080.00 <br />$1,080.00 <br />8 <br />Temporary Inlet Protection <br />7 <br />EA <br />$115.00 <br />$805.00 <br />9 <br />Catch Basin <br />1 <br />EA <br />$4,715.00 <br />$4,715.00 <br />10 <br />Drywell, 8' Diameter,3600 gal <br />2 <br />EA <br />$8,900.00 <br />$17,800.00 <br />11 <br />Storm Sewer Pipe, 8 IN <br />0 <br />LFT <br />$0.00 <br />$0.00 <br />12 <br />Storm Sewer Pipe, Perforated, 12 IN <br />10 <br />LFT <br />$190.00 <br />$1,900.00 <br />13 <br />Compacted Aggregate, No. 53 <br />0 <br />TON <br />$0.00 <br />$0.00 <br />14 <br />HMA Surface, Type B <br />10 <br />TON <br />$192.00 <br />$1,920.00 <br />15 <br />Standard Curb, Concrete <br />360 <br />LFT <br />$22.10 <br />$7,956.00 <br />16 <br />17 <br />Sign Post, Square Type 2, Unreinforced <br />Anchor Base <br />Hydro -mulch Seeding, Mix <br />9 <br />160 <br />LFT <br />SYS <br />$35.00 <br />$20.00 <br />$315.00 <br />$3,200.00 <br />18 <br />HMA Patching, Type B, Undist <br />10 <br />TON <br />$251.00 <br />$2,510.00 <br />ALTERNATE 131 -TOTAL $63,800.00 <br />