BID/PROPOSAL
<br />191'p,(
<br />CITY OF SOUTH BEND
<br />Project
<br />Name:McKinleyvenue and Fremont Park
<br />Im
<br />Improvements
<br />P
<br />Project Number: 118-072
<br />�f
<br />_..................s��
<br />For Bids
<br />Due: December 11, 2018
<br />Contractor
<br />Name: RIETH RILEY CONSTRUCTION, CO., INC.
<br />DIVISION B — FREMONT PARK IMPROVEMENTS (MARQUETT STREET AND FREMONT TO STA. 24+50)
<br />Item No.
<br />Description............_.._..........................................
<br />QuantityU
<br />it
<br />Unit Price
<br />Total
<br />Amount
<br />1
<br />Maintainin Traffic
<br />1
<br />50
<br />5,490.50
<br />2
<br />Mobilization and Demobilization
<br />1
<br />8,200.00
<br />__......._ _.
<br />Clearing of Right of Way
<br />�.-..........3
<br />1
<br />4,322.50
<br />4,322.50
<br />4
<br />Excavation, Common
<br />80
<br />CYS
<br />110.50
<br />8,840.00
<br />5
<br />Surface Milling, Asphalt, 1 1/2IN
<br />240
<br />SYS
<br />19.00
<br />4,560.00
<br />6
<br />Temporary Erosion Control ____.__....._
<br />1........__-- .-
<br />LS
<br />1,160.50
<br />1,160.50
<br />..............�.
<br />7
<br />............................................................................_
<br />Tem
<br />---- Catch Basin
<br />2
<br />EA ......_
<br />3,872.50
<br />7,745.00
<br />9
<br />Drywell, 8' Diameter 3600 Gallon
<br />3
<br />EA
<br />11,755.00 ...
<br />35,26 5.00
<br />.
<br />10
<br />........................... ___..........
<br />Storm Sewer Pipe, 8 IN
<br />0
<br />_...._.........
<br />LFT
<br />0.00
<br />0.00
<br />_.._11 ._..._..__......mmmStorm
<br />Sewer Pipe, Perforated, 12IN
<br />10
<br />LFTmmmmmmm
<br />.............
<br />_95.00
<br />950.00
<br />12
<br />Compacted Aggregate, No. 53
<br />0
<br />TON
<br />0.00
<br />0.00
<br />13
<br />HMA Surface, Type B
<br />................... .._................
<br />20
<br />TON
<br />345.00
<br />6,900.00___.... _
<br />._....._._.._._.14...................................Standard...Curb,-Concrete
<br />.........awww
<br />700
<br />... LFT-___......................_.______
<br />.�_��� __...._
<br />26.50
<br />18,550.00
<br />15
<br />Hydro -mulch Seeding,
<br />Y 9
<br />320
<br />SYS
<br />18.50
<br />5,9 20.00
<br />............... _
<br />16
<br />�w www_...�m....__..__................__
<br />HMA Patching, Type B, Undistributed
<br />............._.
<br />20
<br />TON
<br />698.50
<br />— ------
<br />13,970.00
<br />DIVISION B
<br />- TOTAL
<br />124 150.50
<br />ALTERNATE
<br />BI — IMPROVEMENTS
<br />24+50TO
<br />STA.27+88�
<br />Item No.
<br />Description
<br />Quantity
<br />�................
<br />Unit
<br />.........__________w_m
<br />Unit Price
<br />.....
<br />Total
<br />Amount_........
<br />1
<br />Maintaining Traffic
<br />1
<br />LS
<br />4,100.00
<br />4,100.00
<br />2
<br />............................... .................
<br />Mobilization and Demobilization
<br />1
<br />_—___—_._____
<br />LS
<br />.........................a.a.
<br />2,800.00
<br />2,800.00
<br />3
<br />........... ....... ........ _....................... ................. .........................
<br />Clearingof Right of Way
<br />1
<br />LS
<br />...........................
<br />4,322.50
<br />w
<br />4,322.50
<br />4
<br />Excavation, Common
<br />. 40
<br />CYS
<br />110.50.....__.___......4,4_______________
<br />20.00
<br />---------------------------
<br />5
<br />Surface Milling, Asphalt, 1 1/2IN
<br />120
<br />SYS
<br />19.00
<br />2,280.00
<br />6
<br />____.................................... ........ ... ..... w_
<br />Sign, Relocate
<br />1
<br />_
<br />EA
<br />.......
<br />462.00
<br />..
<br />462.00
<br />7
<br />Temporary Erosion Controlmmmmmmmmm .
<br />1
<br />LS
<br />1,160.50mmmmmmmm
<br />_......1,160.50
<br />8
<br />Temporary Inlet Protection
<br />7
<br />EA
<br />253.00
<br />1,771.00
<br />9
<br />..� __. .....................
<br />Catch Basin
<br />1
<br />EA
<br />___.....
<br />3,872.50
<br />3,872.50
<br />Version 7/20/2018 Contractor's Bid for Public Works - 8
<br />
|