Laserfiche WebLink
BID/PROPOSAL <br />191'p,( <br />CITY OF SOUTH BEND <br />Project <br />Name:McKinleyvenue and Fremont Park <br />Im <br />Improvements <br />P <br />Project Number: 118-072 <br />�f <br />_..................s�� <br />For Bids <br />Due: December 11, 2018 <br />Contractor <br />Name: RIETH RILEY CONSTRUCTION, CO., INC. <br />DIVISION B — FREMONT PARK IMPROVEMENTS (MARQUETT STREET AND FREMONT TO STA. 24+50) <br />Item No. <br />Description............_.._.......................................... <br />QuantityU <br />it <br />Unit Price <br />Total <br />Amount <br />1 <br />Maintainin Traffic <br />1 <br />50 <br />5,490.50 <br />2 <br />Mobilization and Demobilization <br />1 <br />8,200.00 <br />__......._ _. <br />Clearing of Right of Way <br />�.-..........3 <br />1 <br />4,322.50 <br />4,322.50 <br />4 <br />Excavation, Common <br />80 <br />CYS <br />110.50 <br />8,840.00 <br />5 <br />Surface Milling, Asphalt, 1 1/2IN <br />240 <br />SYS <br />19.00 <br />4,560.00 <br />6 <br />Temporary Erosion Control ____.__....._ <br />1........__-- .- <br />LS <br />1,160.50 <br />1,160.50 <br />..............�. <br />7 <br />............................................................................_ <br />Tem <br />---- Catch Basin <br />2 <br />EA ......_ <br />3,872.50 <br />7,745.00 <br />9 <br />Drywell, 8' Diameter 3600 Gallon <br />3 <br />EA <br />11,755.00 ... <br />35,26 5.00 <br />. <br />10 <br />........................... ___.......... <br />Storm Sewer Pipe, 8 IN <br />0 <br />_...._......... <br />LFT <br />0.00 <br />0.00 <br />_.._11 ._..._..__......mmmStorm <br />Sewer Pipe, Perforated, 12IN <br />10 <br />LFTmmmmmmm <br />............. <br />_95.00 <br />950.00 <br />12 <br />Compacted Aggregate, No. 53 <br />0 <br />TON <br />0.00 <br />0.00 <br />13 <br />HMA Surface, Type B <br />................... .._................ <br />20 <br />TON <br />345.00 <br />6,900.00___.... _ <br />._....._._.._._.14...................................Standard...Curb,-Concrete <br />.........awww <br />700 <br />... LFT-___......................_.______ <br />.�_��� __...._ <br />26.50 <br />18,550.00 <br />15 <br />Hydro -mulch Seeding, <br />Y 9 <br />320 <br />SYS <br />18.50 <br />5,9 20.00 <br />............... _ <br />16 <br />�w www_...�m....__..__................__ <br />HMA Patching, Type B, Undistributed <br />............._. <br />20 <br />TON <br />698.50 <br />— ------ <br />13,970.00 <br />DIVISION B <br />- TOTAL <br />124 150.50 <br />ALTERNATE <br />BI — IMPROVEMENTS <br />24+50TO <br />STA.27+88� <br />Item No. <br />Description <br />Quantity <br />�................ <br />Unit <br />.........__________w_m <br />Unit Price <br />..... <br />Total <br />Amount_........ <br />1 <br />Maintaining Traffic <br />1 <br />LS <br />4,100.00 <br />4,100.00 <br />2 <br />............................... ................. <br />Mobilization and Demobilization <br />1 <br />_—___—_._____ <br />LS <br />.........................a.a. <br />2,800.00 <br />2,800.00 <br />3 <br />........... ....... ........ _....................... ................. ......................... <br />Clearingof Right of Way <br />1 <br />LS <br />........................... <br />4,322.50 <br />w <br />4,322.50 <br />4 <br />Excavation, Common <br />. 40 <br />CYS <br />110.50.....__.___......4,4_______________ <br />20.00 <br />--------------------------- <br />5 <br />Surface Milling, Asphalt, 1 1/2IN <br />120 <br />SYS <br />19.00 <br />2,280.00 <br />6 <br />____.................................... ........ ... ..... w_ <br />Sign, Relocate <br />1 <br />_ <br />EA <br />....... <br />462.00 <br />.. <br />462.00 <br />7 <br />Temporary Erosion Controlmmmmmmmmm . <br />1 <br />LS <br />1,160.50mmmmmmmm <br />_......1,160.50 <br />8 <br />Temporary Inlet Protection <br />7 <br />EA <br />253.00 <br />1,771.00 <br />9 <br />..� __. ..................... <br />Catch Basin <br />1 <br />EA <br />___..... <br />3,872.50 <br />3,872.50 <br />Version 7/20/2018 Contractor's Bid for Public Works - 8 <br />