My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Arcadis US Inc - WWTP Stress Testing
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 1 to PSA - Arcadis US Inc - WWTP Stress Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:20:49 AM
Creation date
12/12/2018 12:41:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 2 of 3 <br />Between City of South Bend and ARCADIS U.S., Inc. Project Number: 03029041.0000 <br />...... ..................... .... ... ......... _ __ w ..-__._._.. ...... _ ......... .. ............. <br />AMENDMENT No. 1 <br />Schedule A-1 <br />Scope of Amended Services and Related Matters <br />ENGINEERING SERVICES BY ARCADIS <br />Disinfection Pilot Testing: Arcadis will perform a disinfection pilot test to determine the effectiveness of using 10 to 15 <br />minutes of chlorine contact time in the existing chlorine contact tanks to achieve current microorganism kill permit limits. <br />One full scale and one small scale pilot test will be performed during typical dry weather flows, and one full scale and one <br />small scale pilot test will be performed during typical wet weather flows. Arcadis will work closely with the City to <br />coordinate the time and date of the pilot tests. Arcadis will develop a pilot testing protocol and review with City staff in a <br />meeting via conference call and update the protocol to incorporate the City's input. Arcadis will provide the colorimeter, <br />jar testing apparatus, sodium hypochlorite, sodium bisfulite, and other equipment necessary to perform the small scale <br />pilot tests. Arcadis will summarize the results of the pilot testing in a brief memorandum. <br />The goals of the disinfection pilot testing are: <br />• Perform one full scale pilot test in the existing chlorine contact tanks using dry weather secondary effluent. <br />• Perform one small scale desktop pilot test in the lab using dry weather secondary treatment effluent. <br />• Perform one full scale pilot test in the existing chlorine contact tanks using wet weather secondary effluent. <br />• Perform one small scale desktop pilot test in the lab using wet weather secondary treatment effluent. <br />• Evaluate the effectiveness of less than 15 minutes of contact time in terms of (i) microorganism kill and (ii) <br />chlorine concentration. Document the results for potential future use in discussions with IDEM. <br />Meetings and Site Visits: Arcadis will participate in a meeting via conference call to coordinate the pilot test procedures <br />with plant staff, as noted above. Pilot tests will be performed on site and will require two additional site visits. The full <br />scale pilot test and the small scale pilot test during dry weather will be performed during an additional site visit. The full <br />scale pilot test and the small scale pilot test during wet weather will be performed during an additional site visit. The pilot <br />tests are scheduled to be performed during January or February 2019, before the 2019 disinfection season begins. Should <br />the pilot test schedule extend beyond the anticipated date, additional visits may be necessary through a future amendment. <br />Remaining WWTP Needs Costs. Develop costs for the remaining WWTP plant needs not already completed including <br />Final Clarifier Nos. 1-3, aeration tank air piping replacement, and DAF replacement. Summarize needs in a table. <br />INFORMATION PROVIDED BY CLIENT <br />Client will provide the following information and assistance during the assignment: <br />1. Assistance to obtain the secondary treatment effluent sample for the small scale pilot test. <br />2. Coordinate dry weather and wet weather events and timing of pilot testing. <br />3. Isolate one chlorine contact tank for the full scale pilot tests and vary the chlorine dose. <br />4. Analyze E. coli samples (estimated total number of samples: 36). <br />5. Analyze ammonia samples (estimated total number of samples: 6). <br />6. Analyze TSS samples (estimated total number of samples: 6). <br />.SB WWTP Peak. Flow Strew Testing and Optimization._ Amendment No.. I - AES <br />
The URL can be used to link to this page
Your browser does not support the video tag.