My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Access Permit for I&M - ORC Utility & Infrastructure Land Services LLC - Muessel Grove Park
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Access Permit for I&M - ORC Utility & Infrastructure Land Services LLC - Muessel Grove Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:08:37 AM
Creation date
12/12/2018 12:40:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�"k,494u <br />A k CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Kara Boyles, City Engineer <br />FROM: Becca Plantz, Engineer I <br />SUBJECT: Indiana Michigan Power (I&M) Access Permit Request <br />DATE: November 20, 2018 <br />. wmna�avuu�nw�,r�m.;+�r rwrmumrraor�rrr�mrrsr�mmmu wei �,wuwoio�uu+a u r uuurenm�on rmmawommovnuvn� w000mmimuwmuw�wom��ID�ian�xmm�m wuw.wormm:mwriu ......... �niartr�uvntimx �auormr ax��omu. muvmmmawaw,w�wa�irm+mmm <br />Purpose <br />Approving AEP Indiana Michigan <br />Transmission Company the <br />permission to conduct three soil <br />borings on Elwood Avenue. The <br />purpose of the soil boring study is <br />in respect to AEP Indiana <br />Michigan Power's Central South <br />Bend Reliability Project, one of <br />six projects from Powering Up <br />Greater South Bend Program. <br />The concept is to strengthen the <br />local transmission grid by <br />upgrading two aging substations <br />and constructing an underground <br />Location/Description <br />The stretch of Elwood Avenue <br />being accessed is from Medora 10 r1of ge a�1'h-,P(, WrPn ���ah r rva a rs.�q,,a�ndiaa�, .use a l��r�>�s ��. <br />a",�wda~r° J." �a'��a-�rr ara��u� <br />Avenue to Anderson Avenue. The boring is identified in Figure 1. Also, identified in the figure <br />are water main and sewer structures that may be impacted by boring in this area. Utilities other <br />than the identified water main, sewer, or AEP existing lines shall be identified by AEP I & M. If <br />the soil boring location is in the pavement of the street and not to the side, the combined sewer <br />and water main running the center of this stretch of Elwood Avenue will need to be addressed. <br />Considerations <br />Although, locational awareness of utilities is the focus of the soil borings, transportation will be <br />impacted. At Soil Boring Location 1, SB1, all or a portion of equipment will need to be parked <br />within the street, causing an interruption to through traffic. The access permit form gives AEP <br />the right to trim or cut vegetation if necessary for survey purposes. The vegetation to be <br />impacted at S131 is grass. This will need to be replaced when boring is finished. <br />We deliver services that empower everyone to thrive!! <br />
The URL can be used to link to this page
Your browser does not support the video tag.