Laserfiche WebLink
South Bend Redevelopment Commission <br /> Regular Meeting—May 31, 2012 <br /> 6. NEW BUSINESS (CONT.) <br /> A. South Bend Central Development Area <br /> (3) continued... <br /> cleared for possible rental space. There is a <br /> business plan for that whole block with other <br /> parcels involved. <br /> Mr. Davis stated his opinion that the City is <br /> playing the lottery with this VA Super Clinic. <br /> Mr. Varner asked what square footage is <br /> being used by the VA Clinic. Mr. Schalliol <br /> responded that the current clinic is using <br /> 18,000 sq. ft. of an 80,000 sq. ft. building. <br /> Upon a motion by Mr. Downes, seconded by COMMISSION APPROVED THE PROPOSAL FROM <br /> Mr. Alford, the Commission approved the DJ CONSTRUCTION FOR SITE IMPROVEMENTS AT <br /> proposal from DJ Construction for site ACS/VA(WESTERN AVE.VETERANS <br /> improvements at ACS/VA. Mr. Davis ADMINISTRATION CLINIC) <br /> opposed. <br /> Mr. Inks noted at this time that upon <br /> consultation with Mr. Meteiver, it is possible <br /> to revisit Item 6A(2) if the Commission so <br /> desires. The item was neither approved nor <br /> rejected because either action requires three <br /> votes. He asked if the Commissioners <br /> wanted to reconsider the item at this time, or <br /> wait until the June 14 meeting. <br /> Ms. Jones assumed the chair. <br /> Ms. Jones asked if consideration now would <br /> require that the staff report be repeated. Mr. <br /> Meteiver said it would not, unless Ms. Jones <br /> or Mr. Downes wanted to hear it. <br /> Mr. Downes moved that the Commission THE COMMISSION APPROVED THE <br /> reconsider agenda item 6A(2). Mr. Alford RECONSIDERATION OF ITEM 6A(2). <br /> seconded the motion. The motion carried <br /> with Mr. Davis opposed. <br /> 9 <br />