Laserfiche WebLink
Douglas South Annexation Area 5 <br />SECTION III. MUNICIPAL SERVICES <br />A. Public Works <br />Sewer - A 10" diameter sanitary sewer exists on the Douglas Road frontage of the annexation <br />area. The sewer has sufficient capacity to carry load expected from this Annexation Area and <br />potential future extensions. No additional expenditures will be needed to extend sewer <br />facilities. The City of South Bend and partners extended sewer to this area. It will be <br />necessary to recover a pro rata share of fees for the sewer extension when this property is <br />connected to the South Bend sewer system. <br />Water - The South Bend Water Works currently has a 10" water main on the north side of <br />Douglas Road. <br />South Bend Water Works has no recent flow test data for this location but the static pressure <br />will be about 50 psi. There is adequate capacity for the Annexation Area. No additional <br />expenditures will be needed to extend water facilities. <br />Extensions of, or taps into sanitary sewer and water lines shall be governed by I.C. 36-9-22 - <br />2, I.C. 8 -1.5 -3 and 4, and the rules and regulations of the South Bend Water Works and <br />Sewer Utility. <br />Street Lighting - No additional street lighting will be necessary. The existing street lighting <br />system adequately covers this area. <br />Waivers of Annexation - No waivers of right to remonstrate against annexation are in effect <br />for this area. <br />Streets - Douglas Road is already within City limits and maintained by the City. No street <br />construction or other public capital expenses are planned. <br />2011 Actual Budget Report for the Department: <br />Expenditures: $9,402,157 <br />Miles of Roadway in City: @499.3 <br />Cost per Mile: @$18,830 <br />New Mileage within Area: @0.00 miles (0 feet) <br />Estimated Maintenance cost <br />for Annexation Area per year: @$0 <br />