My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6F (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
05-31-12 Packet
>
6F (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:06:28 AM
Creation date
5/25/2012 12:10:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May. 2011 <br />City of South Bend <br />S.R. 23 and Douglas Road <br />Added Right Turn Lane Page 3 of 3 <br />APPENDIX B <br />Fees for Services & Schedule <br />FEES FOR SERVICES <br />Abonmarche will be paid the lump -sum amount of $27,900.00 for performing Tasks 1 <br />through 5 as described in Appendix A. Abonmarche will invoice the City on a monthly <br />basis for the percentage completed for each task. The following are the fees for the <br />various tasks: <br />Task# 1: <br />Field Survey ............................................................... ............................... <br />$ 4,100.00 <br />Task #2: <br />Design / Permitting ............................................... ............................... <br />$ 15,600.00 <br />Task #3 <br />Bid Documents ......................................................... ............................... <br />$ 5,200.00 <br />Task #4: <br />Bid Period Services ................................................ ............................... <br />$ 1.800.00 <br />Task #5: <br />Construction Phase Services ................................ ............................... <br />$ 2,200.00 <br />TOTALLump -Sum Amount ......................................................... ..............................$ 28,900.00 <br />ANTICIPATED SCHEDULE <br />Task <br />Task # 1 Field Survey <br />Task #2 Design <br />Task #3 Bid Documents <br />Task #4 Bid Period Services <br />Task #5 Construction Phase Services <br />Estimated Completion Time <br />Within 21 days from Notice to Proceed <br />Within 60 days from Notice to Proceed <br />Within 75 days from Notice to Proceed <br />Within 7 days after bids are received <br />Contractor construction period <br />F: \ProposaL \P 1hru P 5 \5oulh Bend 01- tWouglas Rood \SR 23 Turn Lane \appencix 05-18-1 Ldoc <br />Engineers Architects Planners <br />Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.