Laserfiche WebLink
3. Selecting Independent Testing Laboratory: Assist Owner in the selection of an independent <br />testing laboratory to perform the services identified in Exhibit B, Paragraph 132.01.0. <br />4. Pre -Construction Conference: Participate in a Pre -Construction Conference prior to <br />commencement of Work at the Site. <br />5. Schedules: Receive, review, and determine the acceptability of any and all schedules that <br />Contractor is required to submit to Engineer, including the Progress Schedule, Schedule of <br />Submittals, and Schedule of Values. <br />6. Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for <br />locating the Work which in Engineer's judgment are necessary to enable Contractor to <br />proceed. <br />7. Visits to Site and Observation of Construction: In connection with observations of <br />Contractor's Work while it is in progress: <br />a. Day to day site visits and observation of construction will be performed by the <br />Owner. <br />8. Defective Work: Reject Work if, on the basis of Engineer's observations, Engineer believes <br />that such Work (a) is defective under the standards set forth in the Contract Documents, (b) <br />will not produce a completed Project that conforms to the Contract Documents, or (c) will <br />imperil the integrity of the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. <br />9. Clarifications and Interpretations; Field Orders: Issue necessary clarifications and <br />interpretations of the Contract Documents as appropriate to the orderly completion of <br />Contractor's work. Such clarifications and interpretations will be consistent with the intent <br />of and reasonably inferable from the Contract Documents. Subject to any limitations in the <br />Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />10. Change Orders and Work Change Directives: Recommend change orders and work change <br />directives to Owner, as appropriate, and prepare change orders and work change directives <br />as required. <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. Engineer shall meet any Contractor's <br />submittal schedule that Engineer has accepted. <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />