My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Cardno, Inc. - Feasibility Study of St Joseph River
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Cardno, Inc. - Feasibility Study of St Joseph River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:16:50 AM
Creation date
11/28/2018 10:51:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT F, Consisting of 1 pages, referred to <br />i n and part of the Agreement between Owner and <br />Engineer for Professional Services dated Nov, iz, zoos <br />Construction Cost Limit <br />Paragraph 5.02 of the Agreement is supplemented to include the following agreement of the parties: <br />F5.02 Designing to Construction Cost Limit <br />A. Owner and Engineer hereby agree to a Construction Cost limit in the amount of $_ <br />B. A bidding or negotiating contingency of percent will be added to any Construction Cost <br />limit established. <br />C. The acceptance by Owner at any time during Basic Services of a revised opinion of probable <br />Construction Cost in excess of the then established Construction Cost limit will constitute a <br />corresponding increase in the Construction Cost limit. <br />D. Engineer will be permitted to determine what types and quality of materials, equipment and <br />component systems are to be included in the Drawings and Specifications. Engineer may make <br />reasonable adjustments in the scope, extent, and character of the Project to the extent consistent <br />with the Project requirements and sound engineering practices, to bring the Project within the <br />Construction Cost limit. <br />E. If the Bidding or Negotiating Phase has not commenced within three months after completion of <br />the Final Design Phase, or if industry -wide prices are changed because of unusual or unanticipated <br />events affecting the general level of prices or times of delivery in the construction industry, the <br />established Construction Cost limit will not be binding on Engineer. In such cases, Owner shall <br />consent to an adjustment in the Construction Cost limit commensurate with any applicable change <br />in the general level of prices in the construction industry between the date of completion of the <br />Final Design Phase and the date on which proposals or Bids are sought. <br />F. If the lowest bona fide proposal or Bid exceeds the established Construction Cost limit, Owner <br />shall (1) give written approval to increase such Construction Cost limit, or (2) authorize negotiating <br />or rebidding the Project within a reasonable time, or (3) cooperate in revising the Project's scope, <br />extent, or character to the extent consistent with the Project's requirements and with sound <br />engineering practices. In the case of (3), Engineer shall modify the Contract Documents as <br />necessary to bring the Construction Cost within the Construction Cost Limit. Owner shall pay <br />Engineer's cost to provide such modification services, including the costs of the services of its <br />Consultants, all overhead expenses reasonably related thereto, and Reimbursable Expenses, but <br />without profit to Engineer on account of such services. The providing of such services will be the <br />limit of Engineer's responsibility in this regard and, having done so, Engineer shall be entitled to <br />payment for services and expenses in accordance with this Agreement and will not otherwise be <br />liable for damages attributable to the lowest bona fide proposal or bid exceeding the established <br />Construction Cost limit. <br />Pagel <br />(Exhibit F—Construction Cost Limit) <br />EJCDC E-500Agrement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Prof oral Engineersfor EJCDC. All rights reserved.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.