My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Cardno, Inc. - Feasibility Study of St Joseph River
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Cardno, Inc. - Feasibility Study of St Joseph River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:16:50 AM
Creation date
11/28/2018 10:51:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Compensation for Basic Services not including Resident Project Representative) (as described in Exhibit A, Part I) <br />Decision Question: Which method of compensation is to be used? <br />Percentage of <br />Direct Labor <br />Direct Labor <br />Lump <br />Standard Hourly <br />Construction <br />Costs Times a <br />Costs Plus <br />Salary Costs <br />Sum <br />Rates <br />Costs <br />Factor <br />Overhead Plus a <br />Times a Factor <br />Fixed Fee <br />Use This Base <br />Packet <br />Compensation <br />BC -I <br />Packet BC-2 <br />Packet BC-3 <br />Packet BC-4 <br />Packet BC-5 <br />Packet BC-6 <br />Packet <br />Include This <br />N/A <br />Appendices 1 and 2 <br />N/A <br />Appendix 1 <br />Appendix 1 <br />Appendix 1 <br />Appendix <br />2. Compensation for Resident Project Representative (as described in Exhibit A, Paragraph A1.05.A.2, and in Exhibit D) <br />Decision Question: Which method of compensation is to be used? <br />Standard Hourly <br />Percentage ofDirect <br />Labor Costs <br />Salary Costs Times a <br />Lump Sum <br />gates <br />Construction <br />Times a Factor <br />Factor <br />Costs <br />Use This RPR <br />Compensation <br />Packet RPR-1 <br />Packet RPR-2 <br />Packet RPR-3 <br />Packet RPR-4 <br />Packet RPR-5 <br />Packet <br />Include This <br />N/A <br />Appendices I <br />N/A <br />Appendix 1 <br />Appendix 1 <br />A endix <br />and 2 <br />Page 1 <br />(Exhibit C — Compensation Decision Guide) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society or Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.