My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Cardno, Inc. - Feasibility Study of St Joseph River
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Cardno, Inc. - Feasibility Study of St Joseph River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:16:50 AM
Creation date
11/28/2018 10:51:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of nas�es, referred to in <br />and part of the Agreement between Owner <br />and Engineer for Professional Services dated Nov. 12, zols <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1— BASIC SERVICES <br />A1.01 Study and Report Phase <br />A. Engineer shall: <br />1. Consult with Owner to define and clarify Owner's requirements for the Project and <br />available data. <br />2. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer's Basic Services. <br />3. Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental assessment. <br />4. Identify and evaluate three alternate solutions available to Owner and, after consultation <br />with Owner, recommend to Owner those solutions which in Engineer's judgment meet <br />Owner's requirements for the Project. <br />5. Prepare a report (the "Report") which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed -to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, <br />and related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the defmition of Total Project Costs. <br />6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />None <br />7. Furnish one review copies of the Report and any other deliverables to Owner within 90 <br />calendar days of the Effective Date and review it with Owner. Within 30 calendar days <br />of receipt, Owner shall submit to Engineer any comments regarding the Report and any <br />other deliverables. <br />Page <br />(Exhibit A —Engineer's Services) <br />EJCDC E-50OAgreement Between Owner and Engineer for Prof oral Services <br />Copyright 0 2008 National Sudety of Professional Engineersfor EJ.CDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.