Laserfiche WebLink
29. Subcontractor — An individual or entity having a direct contract with Contractor or with <br />any other Subcontractor for the performance of a part of the Work at the Site. <br />30, Substantial Completion — The time at which the Work (or a specified part thereof) has <br />progressed to the point where, in the opinion of Engineer, the Work (or a specified part <br />thereof) is sufficiently complete, in accordance with the Contract Documents, so that the <br />Work (or a specified part thereof) can be utilized for the purposes for which it is intended. <br />The terms "substantially complete" and "substantially completed" as applied to all or part <br />of the Work refer to Substantial Completion thereof. <br />3 L Supplier — A manufacturer, fabricator, supplier, distributor, materialman, or vendor <br />having a direct contract with Contractor or with any Subcontractor to furnish materials or <br />equipment to be incorporated in the Work by Contractor or Subcontractor. <br />32. Total Project Costs — The sum of the Construction Cost, allowances for contingencies, <br />and the total costs of services of Engineer or other design professionals and consultants, <br />together with such other Project -related costs that Owner furnishes for inclusion, <br />including but not limited to cost of land, rights -of -way, compensation for damages to <br />properties, Owner's costs for legal, accounting, insurance counseling and auditing <br />services, interest and financing charges incurred in connection with the Project, and the <br />cost of other services to be provided by others to Owner pursuant to Exhibit B of this <br />Agreement. <br />33. Work — The entire construction or the various separately identifiable parts thereof required <br />to be provided under the Contract Documents. Work includes and is the result of <br />performing or providing all labor, services, and documentation necessary to produce such <br />construction, and furnishing, installing, and incorporating all materials and equipment into <br />such construction, all as required by the Contract Documents. <br />ARTICLE 8 — EXHIBITS AND SPECIAL PROVISIONS <br />8.01 Exhibits Included: <br />A. Exhibit A, Engineer's Services. <br />B. Exhibit B, Owner's Responsibilities. <br />C. Exhibit C, Payments to Engineer for Services and Reimbursable Expenses. <br />D. NOT INCLUDED <br />E. NOT INCLUDED <br />F� Rxhib -, G :1 i . 't""m I Z.NOT INCLUDED <br />G. Exhibit G, Insurance. <br />14, " ' NOT INCLUDED <br />Page 15 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />