My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Airport Annexation Area Sanitary Sewer Extension Proj No 117-108 - Woodruff & Sons Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Airport Annexation Area Sanitary Sewer Extension Proj No 117-108 - Woodruff & Sons Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 2:31:40 PM
Creation date
11/28/2018 10:30:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. The Base Bid covers construction of sanitary sewer and manholes according to the intent <br />of the Plans and Specifications. <br />3. The Contractor shall preserve and protect all surrounding property, structures, tenants, <br />visitors and their property from damage caused by the Contractor's operations. <br />XXII. MUNICIPAL OPERATIONS <br />A. Prevailing Specifications: None <br />1. The Contractor shall be responsible for trash, yard waste, and recycling collection within <br />the project limits. The Contractor shall coordinate with the City of South Bend Solid Waste, <br />Waste Management, and other pickup services as requested to ensure collection services <br />are maintained. The Contractor shall be required to collect bins, place them in a common <br />point for easy access by automated truck services, and redistribution after pickup as <br />requested. <br />2. The Contractor shall be responsible for snow removal within the project limits and shall <br />coordinate with City of South Bend Public Works. The Contractor is responsible for <br />protecting his/her/its project site from excessive wear and tear during snow removal. <br />XXIII. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of 15 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall <br />govern. <br />XXIV. Bid Items 1 2 and. 3� HMA Pavement Surface Intermediate and Base <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 402 <br />B. Additions: <br />1. Match existing pavement, shoulder and driveway approach sections as directed by <br />Engineer <br />XXV. Bid Item 4: Asphalt for Tack Coat. <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 406, City of South <br />Bend Construction Standards and Specifications Section 2-4 <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Sections 300 and 303 <br />Version 7/20/2018 Special Provisions - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.