My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Airport Annexation Area Sanitary Sewer Extension Proj No 117-108 - Woodruff & Sons Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Airport Annexation Area Sanitary Sewer Extension Proj No 117-108 - Woodruff & Sons Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 2:31:40 PM
Creation date
11/28/2018 10:30:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Owner, acts of another Contractor in the performance of a Contract with the Owner, <br />fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and <br />abnormal and unforeseeable weather. <br />XVII. RETAINAGE AND FINAL PAYMENT <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 109 <br />B. Additions: <br />1, Payments will be made every thirty (30) calendar days. Contractor is required to submit <br />the completed "EJCDC Document C-620 Contractor's Application for Payment" form to the <br />City of South Bend Board of Public Works along with electronic certified payrolls for the <br />billed time period. <br />2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a <br />percentage of payments throughout the duration of the project. <br />3. Before final payment and retainage are released the Contractor must satisfy the following: <br />a. All parts and labor meet requirements stated in the specifications. <br />b. Provide copies of test reports or cut sheets on all materials supplied. <br />c. Provide As -Built drawings in accordance with the City of South Bend Prevailing <br />Specifications for Public Works. <br />d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final <br />Waiver of Lien. <br />XVIII. WARRANTY <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. All parts shall include the following: <br />(i) Performance specifications; <br />(ii) Bill of materials <br />(iii) Warranties on all parts; and <br />(iv) Installation and safety requirements. <br />XIX. OTHER UTILITIES <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. The Contractor shall verify the locations of all utilities by contacting Holey Moley at 1-800- <br />382-5544 at least two (2) working days, not counting Saturdays, Sundays or federal and <br />state holidays before proceeding with construction. It shall also be the Contractors <br />Version 7/20/2018 Special Provisions - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.