Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Airport Annexation Area Sanitary Sewer Extension <br />Project Number: 117-108 „ <br />For Bids Due: November 27, 2018 + <br />Contractor Name: Woodruff & Sons. Inc. <br />BASE <br />BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />HMA Type B, Surface <br />37 <br />Tons <br />$131.14 <br />$4,852.18 <br />2 <br />HMA Type B, Intermediate <br />61 <br />Tons <br />$125.91 <br />$7,680.51 <br />3 <br />HMA Type B, Base <br />22 <br />Tons <br />$123.29 <br />$2,712.38 <br />4 <br />Asphalt for Tack Coat <br />70 <br />Sys <br />$31.26 <br />$2,188.20 <br />5 <br />Compacted Aggregate, No. 53 <br />186 <br />Tons <br />$80.95 _I <br />$15,056.70 <br />6 <br />Structure Backfill <br />400 <br />Tons <br />$17.68 <br />$8,840.00 <br />7 <br />Plain Cement Concrete Pavement, <br />97 <br />Sys <br />$61.41 <br />$5,956.77 <br />Approach, 6 inches <br />8 <br />Combination Curb and Gutter, Type A <br />30 <br />Lft <br />$45.49 <br />$1,364.70 <br />9 <br />Concrete Median <br />9 <br />Sys <br />$102.35 <br />$921.15 <br />10 <br />Mulched Seeding, Type R <br />6000 <br />Sys <br />$8.15 <br />$48,900.00 <br />11 <br />Pipe, Sanitary Sewer, PVC SDR 35, 12" <br />2797 <br />Lft <br />$49.86 <br />$139,458.42 <br />12 <br />Pipe, Sanitary Sewer, PVC SDR 21, 12" <br />1600 <br />Lft <br />$66.42 <br />$106,272.00 <br />13 <br />Pipe, Type 3, Circular, 12" <br />162 <br />Lft <br />$173.24 <br />$4,504.24 <br />14 <br />Abandon Existing Pipe <br />310 <br />Lft <br />$145.06 <br />$23,499.72 <br />15 <br />Manhole, Remove <br />2 <br />Each <br />$14.28 <br />$4,426.80 <br />16 <br />Modify Existing Manhole <br />1 <br />Each <br />$1,176.81 <br />$2,353.62 <br />17 <br />Existing 48" Sanitary Manhole, Convert <br />1 <br />Each <br />$4,562.39 <br />$4,562.39 <br />to Drop Manhole <br />18 <br />48" Sanitary Manhole w/Solid Casting <br />9 <br />Each <br />$5,607.15 <br />$5,607.15 <br />19 <br />48" Sanitary Drop Manhole w/Solid <br />3 <br />Each <br />$5,031.73 <br />$45,285.57 <br />Casting <br />20 <br />Temporary Silt Fence <br />4185 <br />Lft <br />$5,560.50 <br />$16,681.50 <br />21 <br />Temporary Inlet Protection <br />_ 2 <br />Each <br />$4.51 <br />$18,874.35 <br />22 <br />Filter Sock <br />900 <br />Lft <br />$418.17 <br />$836.34 <br />23 <br />Tree Removal, 48" and larger, ITITITITmmm <br />....._... 2 <br />Each <br />$6.32 <br />$5,688.00 <br />24 <br />Tree Removal, 36" and larger <br />2 <br />Each <br />$170.59 <br />$341.18 <br />25 <br />Tree Removal, 24" and larger <br />2 <br />Each <br />$170.59 <br />$682.36 <br />26 <br />Tree Removal, 6" and larger <br />4 <br />Each <br />$4,336.44 <br />$4,336.44 <br />27 <br />Clearing Right of Way <br />1 <br />LSum <br />$37,530.14 <br />$37,530.14 <br />Version 7/20/2018 Contractor's Bid for Public Works- 7 <br />