My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Airport Annexation Area Sanitary Sewer Extension Proj No 117-108 - Indiana Earth Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Airport Annexation Area Sanitary Sewer Extension Proj No 117-108 - Indiana Earth Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 2:29:16 PM
Creation date
11/28/2018 10:28:30 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INDIANA EARTH, INC. <br />10343 MCKINLEY HWY <br />OSCEOLA, IN 46561 <br />Section 1 <br />Public Projects completed: <br />1) Excavation & Utility — St Marys College, South Bend, IN <br />2) Northwood High School Phase B — Nappanee, IN <br />3) Excavation & Utility CR 38 —City of Goshen, IN <br />4) Utility —Nappanee WWTP, Nappanee, IN <br />Public Works in Process: <br />1) Northwood High School Athletic Center, Nappanee, IN <br />2) Excavation and Utility — Laporte Intermediate School <br />3) Excavation and Utility— Concord High School <br />4) Excavation and Utility — Warsaw High School <br />5) Excavation and Utility — Penn High School <br />Completed all work awarded to our firm. <br />References of Private Firms <br />1) <br />Rieth Riley Construction <br />574-288-8321 <br />2) <br />Gibson Lewis LLC <br />574-259-8581 <br />3) <br />Larson Danielson <br />219-362-2127 <br />4) <br />Holladay Group <br />574-234-2073 <br />5) <br />Robert Henry Const. <br />574-232-2091 <br />Section 2 <br />Plan of proposed work <br />1) Pre -construction meeting <br />2) Mobilization <br />3) Traffic signs and barricades <br />4) Remove tree's <br />5) Install pipe and manholes <br />6) Remove manholes and abandon existing pipe with flowable fill <br />7) Site restoration <br />$900,000 Fall2017 <br />$168,900 Fall2017 <br />$2,491,277 Spring 2018 <br />$519,020 Summer 2017 <br />$1,233,500 Fall 2018 <br />$1,531,400 Fall2017 <br />$451,100 Summer 2018 <br />$612,400 Summer 2018 <br />$219,400 Summer 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.